Forum quick links
LEED EB - VERSION 2.0 WE prereq 1
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Erika Duran on
- HI everyone, I am wondering if anyone could help me get the insight of the version 2.0 of this particular prerequisite.
Air National Guard Traning facility
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Tyler Barter on
Has anyone worked on an Air national Guard traning facility and been able to determine which areas are considered regularly occupied?
Walk-off mat size
Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Will Britten on
The requirement for walk-off mats is vague in regards to size of mat required.
Stormwater Management
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Randy Walsh on
Does installation of mechanical filter media into the storm drain help meet this requirement? (Flogard curb filter inlet)
Precipitation Intensity - NOAA Website
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Randy Walsh on
Looking for Precipitation Intensity. New NOAA Site lets me select Precipitation Intensity and location and a site, but doesn't return any data.
LEED for Schools Case 1 OR Case 2
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Dana Murdoch on
Can anyone comment on the Case 1 OR Case 2 for LEED for Schools? The letter template make allows you to use EITHER path, not BOTH as is implied in the text above in the LEED User interpretation.
EQc6.1 Documentation
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Dana Murdoch on
Does LEED have a form for inputing rooms/controllability in Version 3 like they did for Version 2.2?? Or do we just make up our own format?
ASHRAE/eQuest question - external blinds and SHGC requirement
CS-2009 EAc1:Optimize Energy Performanceposted by Agnes Vorbrodt on
Hello, In a CS office building we specified SHGC=0.35 (for zone 5 ASHRAE requires
Who may purchase RECs?
Schools-2009 EAc6:Green Powerposted by James Keohane on
Is acceptable for a member of the design team or construction team to purchase RECs? May a project team purchase RECs using project contingency funds directed by Owner?
ACP
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Whit Faulconer on
Thanks Batya, and Susan hit the nail on the head. Proposing that at some point an LCA based credit could be an ACP for some of the MR Credits is tricky for many reasons.