Forum quick links
What about embedded Adhesives
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Maya Karkour on
Hello, Assuming the building is purchasing pre-made MDF, or plywood for interior installation.
Tenant Electricity Meters
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Mitch Gascoyne on
Does anyone have any experience with tenant sub-metering and compliance with this credit?
SHGC of a double skin curtain wall
NC-2009 EAp2:Minimum Energy Performanceposted by Chaan Ah Bahk on
Hi All, I'm working on a project building with double skin facade, and this double skin facade system is equipped with an automatic shading device in the cavity space between the glazings.
Can I use daylight or views to satisfy multiple buildings?
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Erin Holdenried on
I am working on an EB:O&M 2008 multiple buildings project on a campus that includes 10 buildings within the LEED boundary.
energy modeling
CI-2009 EAp2:Minimum Energy Performanceposted by Christine Teichert on
Does CI certification require energy modeling for silver certification?
Recommendations for Wireless Automatic Readings
EBOM-2009 WEc1:Water Performance Measurementposted by Jenny Carney on
Hi All, For those who have meters in hard to reach vaults, I'm wondering if you've found equipment you like for taking remote readings on water meters? Thanks, Jenny
Outdoor Air Ventilation Rates to be Modeled
CS-2009 EAp2:Minimum Energy Performanceposted by Ned Halling on
It is not clear to me how to model the "minimum outdoor air ventilation rates".
The data I have to work with
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Kash Boodjeh on
The data I have to work with for filling this credit out are pre- and post-development calculations for a 100 year storm with a duration of 1 hour.
Pilot 26: Requirement clarifications
Pilot-Credits PC26:Advanced Energy Meteringposted by John Grothues on
Background: Our project is a NC renovation of a building that is connected to district energy systems. Question: The credit requirements state that we must follow LEED's DES requirements.
Naturally ventilated office rooms served by ductless split sys.
NC-2009 IEQp1:Minimum IAQ Performanceposted by Orlin Velinov, PE on
We have a project that is predominantly a parking garage structure.