5% Requirement Clarification

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Marie Gruel  on 

I have a zero lot line project, so all landscaped areas are within planters on the plaza level, or in tree wells in the sidewalk.

1
Fri Jul 29, 2011, 5:21 pm

Roof Terraces and Balconies

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Catalina A  on 

We are certifying a Hotel Project earning credit SSc2.

1
Fri Oct 21, 2011, 11:02 pm

Comparing Process Pumping between Baseline and Proposed

NC-2009 EAc1:Optimize Energy Performance
posted by  Evelyn Dicks, EI, CxA  on 

I am working on a lab building near the coast where seawater is pumped into the building for use by researchers.

1
Thu Sep 8, 2011, 3:00 pm

Modeling PCW Heat Rejection for DES vs. System 5 (DX Cooling)

NC-2009 EAc1:Optimize Energy Performance
posted by  Evelyn Dicks, EI, CxA  on 

I am working on a building that supplies process cooling water (PCW) to lab spaces. The PCW rejects its heat through a heat exchanger to the chilled water system from a district energy plant.

1
Thu Sep 8, 2011, 2:54 pm

vestibule instead of pressure difference

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Nándor Kovács  on 

I found in ASHRAE 62.1-2004 standard that using a vestibule to provide airlock between garage and regulary occupied spaces is a compilant way to limit the entry of exhaust gases. Is it possible to

1
Mon Nov 21, 2011, 6:05 am

LEED Project Boundary, Existing Irrigation, and Crane Placement

NC-2009 WEc1:Water Efficient Landscaping
posted by  Brooks Critchfield  on 

We have a project on an existing campus which requires that two large cranes sit next to the project on an adjacent turf area.

1
Thu Aug 11, 2011, 5:14 pm

Exhaust Rate of at least 0.5cfm/sq.ft

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Maya Karkour  on 

Hi All, Assuming that one of the hazardous chemical area also has a fresh air supply (in addition to the exhaust), how do we determine if the min exhaust rate (0.5cfm/sq.ft) is achieved.

1
Tue Oct 18, 2011, 10:29 pm

ETS - Testing

CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  oliver schuster  on 

Hello, we are currently working on a project and the owner intends to include several smoking rooms for the project.

1
Tue Nov 22, 2011, 5:20 am

Extended Stay Hotel

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  S D  on 

Would an extended stay hotel be considered residential?

1
Mon Aug 8, 2011, 6:28 pm

75% Whole Building Reuse

Pilot-Credits PC19:Whole Building Reuse
posted by  Bradley Guy  on 

Hello Heather, To answer your questions - 1. Yes that is correct this is the total of structural and non-structural assemblies and components as defined by each in MRc 1.1 and 1.3. 2.