Forum quick links
5% Requirement Clarification
EBOM-2009 WEc3:Water Efficient Landscapingposted by Marie Gruel on
I have a zero lot line project, so all landscaped areas are within planters on the plaza level, or in tree wells in the sidewalk.
Roof Terraces and Balconies
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Catalina A on
We are certifying a Hotel Project earning credit SSc2.
Comparing Process Pumping between Baseline and Proposed
NC-2009 EAc1:Optimize Energy Performanceposted by Evelyn Dicks, EI, CxA on
I am working on a lab building near the coast where seawater is pumped into the building for use by researchers.
Modeling PCW Heat Rejection for DES vs. System 5 (DX Cooling)
NC-2009 EAc1:Optimize Energy Performanceposted by Evelyn Dicks, EI, CxA on
I am working on a building that supplies process cooling water (PCW) to lab spaces. The PCW rejects its heat through a heat exchanger to the chilled water system from a district energy plant.
vestibule instead of pressure difference
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Nándor Kovács on
I found in ASHRAE 62.1-2004 standard that using a vestibule to provide airlock between garage and regulary occupied spaces is a compilant way to limit the entry of exhaust gases. Is it possible to
LEED Project Boundary, Existing Irrigation, and Crane Placement
NC-2009 WEc1:Water Efficient Landscapingposted by Brooks Critchfield on
We have a project on an existing campus which requires that two large cranes sit next to the project on an adjacent turf area.
Exhaust Rate of at least 0.5cfm/sq.ft
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maya Karkour on
Hi All, Assuming that one of the hazardous chemical area also has a fresh air supply (in addition to the exhaust), how do we determine if the min exhaust rate (0.5cfm/sq.ft) is achieved.
ETS - Testing
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by oliver schuster on
Hello, we are currently working on a project and the owner intends to include several smoking rooms for the project.
Extended Stay Hotel
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by S D on
Would an extended stay hotel be considered residential?
75% Whole Building Reuse
Pilot-Credits PC19:Whole Building Reuseposted by Bradley Guy on
Hello Heather, To answer your questions - 1. Yes that is correct this is the total of structural and non-structural assemblies and components as defined by each in MRc 1.1 and 1.3. 2.