Tenant area commissioning

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  sompoche sirichote  on 

Our project is an office building with 10 floors on the top are leased out as a hotel tenant and we are seeking for LEED CS certified. If the mechanical and electrical plant of the hotel are separa

1
Mon Nov 21, 2011, 2:18 pm

Baseline HVAC Equip Vs. Proposed HVAC Equip

NC-2009 EAc1:Optimize Energy Performance
posted by  Greengrade User  on 

Question: Does the HVAC system for the baseline have to be the same type as the proposed design HVAC equipment? (ie.

1
Thu Sep 8, 2011, 2:42 pm

Asphalt Roll Roof Recycling

CI-2009 MRc2:Construction Waste Management
posted by  Sabrina B  on 

I am working on a existing building renovation. The existing roof, which will be demo'd, is asphalt roll with batt insulation underneath.

1
Tue Nov 8, 2011, 7:30 pm

CI on site Green Power?

CI-2009 EAc4:Green Power
posted by  Robin Hurt  on 

Is it possible to install onsite renewable energy that met the energy production requirements for energy usage of CI EA4 in lieu of purchasing Green Power?

1
Thu Sep 22, 2011, 4:53 am

Hi, I have a project in the

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  matthew strong  on 

Hi, I have a project in the NY zip code 10589 that has two types of irrigation: 1. Unmetered irrigation by retention pond for 58,094 SF of lawn and trees along the driveway 2.

1
Wed Oct 19, 2011, 8:49 pm
1
Mon Nov 21, 2011, 8:53 pm
1
Fri Aug 26, 2011, 3:23 am

Foyer as occupided or unnocupied space

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  marisol cano  on 

Hello, Anybody knows if a Foyer in a Hotel (mainly a hall to access 3 meting rooms with a "coffe and cookies" table for the meeting room users) would count as occupied space?

1
Thu Aug 18, 2011, 12:16 am

LEED CI 2004, Credit 1.1 Optimize Energy Performance

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  David Rodriguez  on 

When reviewing the CI forms from an older project that were filled out by a consultant, I noticed they had taken 10% credit towards the installed lighting power for occupancy sensor control of ligh

1
Mon Oct 10, 2011, 9:33 pm

Roll-out Mats

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Caroline O'Leary  on 

As I'm writing an e-mail to a client regarding the requirements for roll-out mats to meet LEED requirements, I'm questioning the following - if we have walk-off carpet installed over the entire Lob

1
Thu Aug 18, 2011, 7:14 pm