Forum quick links
Vegitative Roof Shading == High Reflectant Surface ?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Jean Marais on
Dear Forum, I am submitting an alternative path for compliance, in that even though the vegetation reflection and emission properties of the leaves of my vegetated roof shading is only SRI 23, we s
LEED CS - EAp2 Existing equipment to remain
CS-2009 EAp2:Minimum Energy Performanceposted by BAOQUY VU on
I have an existing 90,000 SF, 3-story office building in Massachusetts consisting of VAV boxes with electric reheat and rooftop units that also have electric heat.
Grouting
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Petra Hajná on
Hi. We want to use a grout for surface leveling under the baseplate of steel anchors on roof.
Faucet flow rate test and restraining measure
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Charlie Zhu on
Hi. As requested by the review team, we need to prove the faucet flow rate. However, we can not find any data from the manufacturer. We use a basin and a stopwatch to test the flow rate.
Greenguard-Certified Systems in International Projects (Asia)
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Raymond Loo on
Have any of you had any experience in dealing with this credit in an international project, particularly in Asia? Has anyone ever heard of NQA / UKAS Environmental Management.
Commissioning for LEED-CI
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by monu goyal on
We are going to commission our interior space to get certify with LEED-CI.
REC vendors for Singapore Project
CI-2009 EAc4:Green Powerposted by Yong Lee Low on
For our Singapore projects, we need to buy REC but are not sure where to start searching?
General LEED-CI question
CI-2009 MRc4:Recycled Contentposted by Kimberly Cullinane on
I am working with a client that is looking at multiple new spaces in multiple locations.
PVs added after design submission
NC-2009 EAc2:On-Site Renewable Energyposted by Aliesa Adelman on
If an energy model has been reviewed during design phase submission and PVs are added during construction but were not included in the model, can the model be rerun and resubmitted during the const
Community Connectivity - residential density
CS-2009 SSc2:Development Density and Community Connectivityposted by Mark Pappas on
I am working on a project (LEED CS 2.0) that easily meets the services requirement, but I'm having a hard time with the residential density requirement.