Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Peak Demand Reduction Credit NOT Demand Response

Pilot-Credits EApc8:Demand response
posted by  Debra Lombard  on 

HI Everyone, I am working on a LEED-NC v2.2 project which is small but has three technologies that reduce peak demand which is critical here in Connecticut. My question is how to calculate that %

0

Can 10' requirement be met by a combination of mats?

Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Renee Shirey  on 

Due to space constraints, our vestibules were not able to be a full 10' wide between our doors, thus the recessed walkoff mats aren't 10'.

1
Fri Aug 26, 2011, 7:03 pm

WEc2 Regional Priority Credit

EBOM-2009 RPc1:Regional Priority
posted by  Kevin Wilcox  on 

I have a EBOM project where we have provided documentation for WEc2 and have exceeded the threshold for the RPC.

1
Mon Aug 29, 2011, 3:07 pm

Tenant build-out

CS-2009 EAp2:Minimum Energy Performance
posted by  Marco ZM  on 

We are in the process of modelling/simulating of office building in LEED C&S 2009 for EAp2 and EAc1 – Option 1. Building is divided into two parts: owner occupied space and offices for rent.

1
Wed Sep 28, 2011, 1:49 am

WATER USE REDUCTION

CI-2009 WEc1:Water Use Reduction
posted by  sajeev john  on 

DOES THE COMMON TOILEST IN A FLOOR COME UNDER TENANT SCOPE? ENTIRE FLOOR IS OCUPIED BY SAME COMPANY? FLOOR IS MEANT TO BE RENT TO DIFFERENT TENANATS AND OUR COMPANY IS OCCUPYING THE ENTIRE FLOOR?

1
Mon Nov 21, 2011, 4:33 am

Shading devices vs daylighting

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Rudolph Schaar  on 

ASHRAE 189.1, 8.4.1.2 requires us to have permanent shading devices. We are attempting to achieve the Daylighting credit 8.1.

1
Mon Sep 12, 2011, 5:19 pm

IIC in IEQc9

Schools-2009 IEQc9:Enhanced Acoustical Performance
posted by  Gary Madaras  on 

Just want to double check . . . As far as I can see, there are no IIC requirements in IEQc9. Can someone confirm please? Thanks.

1
Fri Sep 30, 2011, 3:39 pm

Garage and technical rooms

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  BH .  on 

Hello, We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them?

1
Thu Sep 22, 2011, 7:01 pm

Green wall in a Lobby

CS-2009 IDc1:Innovation in Design
posted by  Anna Korinkova  on 

Hi, Our project team would like to use a green wall placed in our office building's atrium as an innovation in design credit.

1
Fri Sep 2, 2011, 4:45 pm

Refrigerant Management Plan

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Chris Munn  on 

Does anyone know of a good resource to use as a template for developing a refrigerant management plan for a building?

1
Wed Sep 26, 2012, 9:58 am