University Dormitory
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Patti Gunderson on
This project includes 49 apartment-style dormitory spaces, all of which have multiple occupancy.
Lighting Compliance - 2003 - Texas
CI-2009 EAp2:Minimum Energy Performanceposted by Jamie Angulo on
Our restaraunt is about 50% over the current allowed wattages. What can we do to drop it? Does 'graphical lighting' have to be counted in the total?
Estimating credit acheivement
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Amanda Ross on
1) Does anyone know of any local/regional programs with the 80% standard in the Vancouver, BC area?
Definition of "Outdoor Air"
NC-2009 IEQp1:Minimum IAQ Performanceposted by James Chueh on
We are seeking LEED NC certification in a high-tech manufacturing plant, and it is a normally practice to only use natural ventilation (louvers and openings to outside of the building) for spaces s
SSc7.2 Option 3
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Markus Henning on
In my project I will achieve the requirements of SSc7.2 with option 3. The roof is covert by 10% green roof and 60% white gravel and …..
Charging stations for oversized parking lot
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Thomas Gragnano on
We are working on an adaptive re-use project where the client has purchased an existing manufacturing facility and it is being coverted for use as an office and testing lab for a research institute
Are Form submetering requirements greater than Ref Guide?
CI-2009 EAc3:Measurement and Verificationposted by Raphael Sperry on
In Case 1 (project
Evidence Required: sample lease(s) associated with LEED
NC-2009 EAp2:Minimum Energy Performanceposted by Jane Long on
Hi All, Could someone please enlighten me as to the relevant of the requirement to “provide the lease(s) or sample lease(s) associated with the LEED project” please? What leases?!
Denial of PC9 for non-compliance w/ technical requirements
Pilot-Credits PC9:Street Networkposted by Michael Miller on
We had registered our CI project for PC9 prior to the change to the credit that limited it to Homes projects.
Tenant owned chiller with R-11?
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Chris Munn on
I am working with a large building in New York. This building has a tenant that has their own chiller that utilizes R-11 refrigerant.