Polished Plaster (Armourcoat Perlata) Categorization in LEED
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by mary ostafi on
I recently spent a great deal of time trying to determine where a polished plaster product (Armourcoat Perlata) falls into LEED.
HVAC Protection
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Patana Rattananavathong on
I have a project that don't use any HVAC system. It's all natural ventilation. Is it ok to left the HAVC protection out since there is nothing to protect.
Unable to Meet Pre-req during Current Performance Period
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Kristofer Kiszynski on
I was wondering what would happen if we failed to meet a prerequisite such as IEQp1. Would we need to restart our performance period after correcting whatever it is that needs to be corrected?
viscose
CI-2009 MRc6:Rapidly Renewable Materialsposted by Giselle Walsh on
If a product has cotton and viscose blend, can I the entire product be considered rapidly renewable or just the cotton portion?
no local zoning
Schools-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Christine Teichert on
I looked on the ITE website and can't find a free version of this "Parking Generation". Any thoughts on where to find this and how to navigate through it to find the exact table I'm looking for??
SRI for Corrugated metal roof
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Noriko Nagazumi on
Our project has corrugated metal roof like which can be shown by clicking the link below. http://www.sakata-s.co.jp/product/88.html The roof will be installed almost horizontally as a whole.
No New Parking - to document alternative compliance or not?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Cynthia Ottenbrite on
The project is an existing building - major renovation. The existing parking lot is being ripped up to drill the geothermal wells.
Energy Star Prerequisite - computer as process load
CI-2009 EAp2:Minimum Energy Performanceposted by Patricia Hancock on
We're an Applied Tech School that teaches CAD and complex simulation technologies.
Granite for Paving
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Udana Ratnayake on
Has anyone proved credit compliance using granite as the paving material? what's the SRI of granite?
Project impacts another area not a part of the Project Boundary
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Melissa Kemp on
My question is: What if a LEED project disturbs land owned by a different party? i.e. if they have to excavate in an adjacent parking lot to install utilities for the building seeking LEED.