Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Smoking Rules within construction project boundaries

NC-v4 EQc3:Construction indoor air quality management plan
posted by  Marine Petrosyan  on 

Hi, All!

We are currently facing two major questions during the work with the construction project team. 

1
Sustainable Design Leader
HKS, Inc.
LEEDuser Premium Member
40 thumbs up
Tue Aug 5, 2025, 4:00 pm
4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Aug 24, 2023, 6:31 am

Interior Project Water Performance

EBOM-v4.1 WEc1:Water Performance
posted by  yingling guan  on 

For interior project, if there is only one pantry faucet within the project scope.  And occupants of this project will use other indoor water fixtures or fittings installed out of the thi

1
Wed Apr 5, 2023, 1:59 pm

Quality Views from Skylight

Pilot-Credits EQpc117:Quality views in nonregularly occupied spaces
posted by  Yifeng Xu  on 

Hi All,

We have one project with skylight on the roof and thinking if it is eligible as the quality view. Considering:

0

Water bottle drinking fountain - water usage

NC-v4 WEc2:Indoor water use reduction
posted by  Erin Rowe  on 

I see that water-bottle fill stations / drinking fountains are not on the list of fixtures in the calculator. Do we just leave those out of the water savings calculations?

3
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Thu Apr 25, 2019, 4:16 pm
3
Fri Apr 6, 2018, 5:30 pm

Reverberation Time and Volume

NC-v4 EQc9:Acoustic performance
posted by  Avtua Kraveishvili  on 

Hi, I have project where is several open plan offices with different volumes. LEED Acoustic Performance requires T60 below 0.8 sec.

0

Waste to energy in LEED v3

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Darya Lukicheva  on 

Hello. I'm now working on a large project (180 000 m2) certification under LEED 2009 NC.

1
Sun Jan 8, 2017, 9:40 pm