Forum quick links
Baseline Design Air Flow - System 5
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
The project we are modeling belongs to System 5. There is however no cooling needed or designed.
furniture made from laminated boards with A class according to French legislation
NC-v4 EQc2:Low emitting materialsposted by Agnieszka Rylska on
In our project we have plan to make individual furniture components from laminated boards on site.
Ventilation requirements for a freeze box and cold box
NC-2009 IEQp1:Minimum IAQ Performanceposted by Frantisek Macholda on
Hello everybody,
VOC Range in Low-Emitting Calculator
NC-v4 EQc2:Low emitting materialsposted by Agnieszka Rylska on
We received the documentation confirming that material which will be applied on site (steel elements in these specific case) has emission of VOC compliant with ISO 16000-9 following French legislat
ID#100002123
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Agnieszka Rylska on
Hello,
Certificates for hot district water?
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Izabela Kwiecinska on
Hello Everyone, We are preparing our Client to buy Green-e certified energy. We don't know if he has to buy also GOs or carbon offsets for district hot water that the building is supplied with.
Parking spaces for trucks
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Alicja Bieszyńska on
My project is a distribution center that serves number of loading trucks every day.
Sensors calibration during the performace period
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by Agnieszka Rylska on
Is it necessary to calibrate sensors during the performance period even if the manufacturer’s recommended interval didn't pass yet?