Forum quick links
CO2 sensors in retail spaces
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Agnieszka Rylska on
Should retail spaces in a shopping mall have CO2 sensors? Does anyone know if shops are treated as densely occupied spaces?
Certificates for hot district water?
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Izabela Kwiecinska on
Hello Everyone, We are preparing our Client to buy Green-e certified energy. We don't know if he has to buy also GOs or carbon offsets for district hot water that the building is supplied with.
Baseline Garage Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, ASHRAE 62.1-2007 establishes a ventilation exhaust rate for garages of 0.7 cfm/sq.ft. Our project has lower rate and besides it applies a CO control settings of 20mg/m3. The question is:
LEED EBOM
Pilot-Credits EQpc78:Design for active occupantsposted by Lukas Urban on
Hi! Can we use this Pilot-Credit in a LEED EBOM project? Our staircase meets almost all the conditions. Thank you.
VRP Compliance Calculator
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, Regarding VRP Compliance Calculator (IEQp1), there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several
Baseline System 9 fan details
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, We have zones in our project which are addressed to system 9 (heating only).
renovation of multiple non-contiguous parts of an office
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Agnieszka Rylska on
The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated.
Underground infiltration tank
NC-v4 SSc4:Rainwater managementposted by Frantisek Macholda on
Hello, our project is constrution of the new storage hall on the place of the previously existing old one. (Demolition + new construction).
SRI required testing amounts
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Anna Korinkova on
Hello, could anybody tell me how we can state the number of SRI tests on a project? We intend to place gravel on the roof and provide a concrete parking log.
Baseline Chilled water pumps - G3.1.3.10
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The standard states that the pump power must be 22 W/gpm. If the project has two chillers and primary secondary circuits, whereby there is on pump per chiller in the primary circuits and