Innovation credits from WELL rating system
CI-v4 INc1:Innovationposted by Gabriela Mena on
We have a Commercial Interiors project and they have policies for the users that are similar or equal to the fitness and nourishing requirements for the WELL certification.
Base Case vs Project Case
CS-2009 EAp2:Minimum Energy Performanceposted by Dana Guzman on
Hi, can you kindly clarify whether the glazing percentage and floor area for the base case needs to match the project case when reviewing compliance for EAp2?
Frequency of rides per day that have to be given by the shuttle
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Jorge Lopez de Obeso on
We are working on a project in which the nearest bus stop is just over a quarter mile so it is proposed to provide a shuttle service to take users to the bus stop.
Efficiency First
EBOM-v4 WEc1:Outdoor water use reductionposted by LEED Pro Consultant on
Does the 30% reduction need to be accomplished through landscape efficiency first and then add up alternative water sources, or may this be accomplished through any landscape irrigation means (alte
LEED BD+C 2009 vs v4
posted by MARIA FERNANDA VILLANUEVA RAMOS on
Hi, I'm working on the certification of a high school, it would be my first certification. I became a LEED AP BD+C with the v4, but I have been reading that almost all the projects get certified wi
Planting in conservancy areas
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Roberto Meza on
Hi everyone, We have a project in a greenfield, it's conservancy areas consist of vegetation that is mostly dry grass.
Document no materials and earn the credit
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by LEED Pro Consultant on
Hi, we are working in a Cold dark shell, therefore interiors and fit outs will not have any finish.
Energy Rater
posted by Gustavo De las Heras Izquierdo on
Hallo, we want to certify a home outside the U.S.
BMS
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Gustavo De las Heras Izquierdo on
Hallo, We are working on two projects located in Mexico DF. One of them doesn't have a BMS and the other has a BMS but it does not provide trend graphs.
Robotic Parking Garage Ventilation
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Gabriela Mena on
Hi, We have designed a project in Mexico which includes 5 levels for parking garage but it is a robotic parking, we are including a small ventilation fan for each level that provides approx 0.1 cf