EBOM-v4 LTc1:Alternative transportationposted by LEED Pro Consultant on
Are we able to use a shuttle run by building owner as an alternative transportation strategy? Thank you!
Materials and product certificaction topic
posted by Alejandro LOPEZ on
Hi. If I have a material/product with an US LEED certificación, I could use it to submit it to the CaGBC LEED dossier? Thanks in advance, for the answer.
Shared underground parking with non LEED certified buildings
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jorge Lopez de Obeso on
Our project, a 200,000 sqft CS office tower (much more to the 20% of the total area) shares 3 levels of underground parking lot with two other buildings (Movie theater, shops, restaurants).
Leed Footprint exceeds leed Boundary
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Jorge Lopez de Obeso on
Hi, I'm having some problems with a project.
Environmental Product Declaration
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Gabriela Mena on
Hi, We are evaluating the EPD performance of a commercial interior project furniture, the architects are specifiyng Herman Miller Furniture and almost all have the BIFMA certification, I would li
We are in the process of
EBOM-v4 WEp1:Indoor water use reductionposted by LEED Pro Consultant on
We are in the process of certifying a Core and Shell building which does not have a previous LEED certification.
Daily Occupancy for a cinema
Retail-CI-v2009 WEp1:Water use reductionposted by LEED Pro Consultant on
Im working on a CI Cinema Project , there are some areas like Fast Food Service, how can I determinate the occupancy for the persons that are going to the cinema, under Visitors or Customer Retail?
LEED Boundary for an Existing Multitenant Building
EBOM-2009 MPR3:Must use a reasonable site boundaryposted by Gabriela Crespo on
Dear All, We are working on a multi-tenant project in Mexico that wishes to pursue LEED O+M Certification, there are two areas on the ground floor with tenants who do not wish to participate in th
Rainfall over landscape areas
EBOM-2009 WEc3:Water Efficient Landscapingposted by Rubén M. R. on
Would it be valid to claim 50% potable water reduction for irrigation if I have a landscape area that requires X galons of irrigation during the month of July (according to the LEED form) and I can
Tenants
EBOM-2009 IEQc2.3:Occupant Comfort—Thermal Comfort Monitoringposted by Gustavo De las Heras Izquierdo on
Does anyone know if all the tenants need to be included in this credit?