Forum quick links
Project Mexico
NC-2009 PIf4:Schedule and Overview Documentsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .
Credit 7.1 and 7.2
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Alejandro Macias on
I am working on a dormitory Project and it has different buildings (one for the kitchen, one for administration, girls dormitory….).The roof of this buildings are connected with each other, so almo
Requirements for instant water heater with no storage tank
NC-2009 EAp2:Minimum Energy Performanceposted by Gustavo De las Heras Izquierdo on
Hallo, I have read the insulation requirements in Section 7.4.3 but it seems to focus on circulating and non-circulating systems with a storage tank.
MERV filters
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Is there any mandatory filter efficiency requirement (MERV) for projects located in areas with a very high PM2.5 levels? Is it mandatory for ASHRAE 62.1-2010 requirements?
LOW VOC Comply
CI-v4 EQc2:Low emitting materialsposted by Brigitte Solis W on
Hi, I am completing the VOC calculator, but if I put a product with the maximum allowed value it does not comply. For example if they ask for 70 and my product has 70 for v4 is not fulfilling?
ANY PRESENTATIONS DONE FOR NEW LEED FOR HOSPITALITY?
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by robert feduik on
I'm asked to give a talk on LEED for Hospitality...was wondering if there are any good PPT presentations that might be available?
Bamboo and CS
CS-2009 MRc6:Certified Woodposted by Rosario Lidia Maguey Peña on
Hi! Is bamboo included in credit MRc6 for Core and Shell? We have a Core and Shell project in which the client wants an specific wood finish for the ceiling in the Lobby.
Balancing Devices to meet ASHRAE 90.1 Mandatory Requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Torres-Coto on
We have a project that is an industrial facility, it shares the CHW distribution piping between the comfort system and the process system. We are informing the CxTeam that it is required to have b
About disturbance considerations for retention walls.
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Mauricio Ramirez on
Hi everyone: I have a Project that needs to have large retention walls close to the office and main acces road.
Alternative Compliance Path
CS-2009 EAc1:Optimize Energy Performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if the