Forum quick links
BMS
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Gustavo De las Heras Izquierdo on
Hallo, We are working on two projects located in Mexico DF. One of them doesn't have a BMS and the other has a BMS but it does not provide trend graphs.
Robotic Parking Garage Ventilation
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Gabriela Mena on
Hi, We have designed a project in Mexico which includes 5 levels for parking garage but it is a robotic parking, we are including a small ventilation fan for each level that provides approx 0.1 cf
Thermal controls for 50% occupants
CI-v4 EQc5:Thermal comfortposted by Gabriela Mena on
Hi, We have a project in Mexico City, the system is VRF and for the interior spaces we have Fan coil units, approximately 60% of the project area is open office space and it is complicated to pro
Bus parking space
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by jorge calderon on
To achieve ss.
Commissioning Requirements Off-site
posted by Alicia Villanueva on
Dear all, We are choosing to follow the option of off-site space but funded by the project for this credit. The location is an existing building near the project site.
Case2 Option 1- Labs
EBOM-2009 EAc1:Optimize Energy Performanceposted by Alicia Villanueva on
The project is an innovation center, it has offices (63%), laboratory (28%) and data center (8%), the lab represents more than 10% of the area, we have to use the USGBC Calculator Case 2 Option 1-
Tenant submetering
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Gustavo De las Heras Izquierdo on
I’ve read in the Bird’s Eye View Section that “Tenant submetering would not alone qualify for this credit. […]”.
SR Natural stone
NC-v4 SSc5:Heat island reductionposted by Juan Carlos Contreras on
Hello, About the option 1 Nonroof and Roof, we are using a natural Stone (local material), Off-White color, for the pavement in the main square and walkway.
Documentation required
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Our project is a 26-storey building located in Mexico City with more than 20 tenants. The HVAC consists of AHUs and VAV-boxes with recirculation at the AHU.
LEED Form MR 4
NC-2009 MRc4:Recycled Contentposted by juan pena on
The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?