EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Gustavo De las Heras Izquierdo on
I’ve read in the Bird’s Eye View Section that “Tenant submetering would not alone qualify for this credit. […]”.
SR Natural stone
NC-v4 SSc5:Heat island reductionposted by Juan Carlos Contreras on
Hello, About the option 1 Nonroof and Roof, we are using a natural Stone (local material), Off-White color, for the pavement in the main square and walkway.
Paints Low Emissions
CI-v4 EQc2:Low emitting materialsposted by Gabriela Mena on
Hi, We have a CI project in Mexico, we are specifying a National paints trade and the certification for VOC is the standard ASTM D 3960, which is not in the list of third party certifications acc
LEED O&M on a portion of a building
EBOM-v4 MPR3:Must comply with project size requirementsposted by LEED Pro Consultant on
Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?
Exterior space, partially enclosed - Application of Std.
NC-2009 IEQp1:Minimum IAQ Performanceposted by Mauricio Ramirez on
Hello in a Museum, we have an uderground open space, that, on our understanding is an exterior space, as it is outside the Access vestibule.
Existing Buildings
Pilot-Credits EQpc78:Design for active occupantsposted by Rubén M. R. on
This pilot credit is an incentive for existing building owners to plan a renovation of unused stairs.
% of Glazing & Floor Area Base Case vs Project
CS-2009 EAp2:Minimum Energy Performanceposted by Dana Guzman on
Hi, I am new to LEED and looking at the energy model submitted by our consultant for the compliance on EAp2. I have a basic question.
Demonstrate Savings for CRAC Units
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Gabriela Crespo on
Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES.
Product type classification
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Raquel Ortiz on
Hello, I have a project where a Stonhard flooring system will be installed, like a terrazzo floor characteristics, The system has a hardener for two components coating and a quartz aggregate, the
Showers & Changing Facilities
CS-v4 LTc6:Bicycle facilitiesposted by Edna Urias on
We were wondering if a Core & Shell building will be subdivided in a future for 2 tenants, do we have to consider shower facilities at 100 feet from each main entrance ?