Tenant submetering

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Gustavo De las Heras Izquierdo  on 

I’ve read in the Bird’s Eye View Section that “Tenant submetering would not alone qualify for this credit. […]”.

1
Mon May 2, 2016, 5:59 pm

SR Natural stone

NC-v4 SSc5:Heat island reduction
posted by  Juan Carlos Contreras  on 

Hello, About the option 1 Nonroof and Roof, we are using a natural Stone (local material), Off-White color, for the pavement in the main square and walkway.

1
Tue Jul 19, 2016, 7:29 pm

Paints Low Emissions

CI-v4 EQc2:Low emitting materials
posted by  Gabriela Mena   on 

Hi, We have a CI project in Mexico, we are specifying a National paints trade and the certification for VOC is the standard ASTM D 3960, which is not in the list of third party certifications acc

1
Sat Aug 26, 2017, 8:04 pm

LEED O&M on a portion of a building

EBOM-v4 MPR3:Must comply with project size requirements
posted by  LEED Pro Consultant  on 

Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?

1
Tue Jan 17, 2017, 6:05 pm

Exterior space, partially enclosed - Application of Std.

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Mauricio Ramirez  on 

Hello in a Museum, we have an uderground open space, that, on our understanding is an exterior space, as it is outside the Access vestibule.

1
Mon Jul 6, 2015, 10:20 pm

Existing Buildings

Pilot-Credits EQpc78:Design for active occupants
posted by  Rubén M. R.  on 

This pilot credit is an incentive for existing building owners to plan a renovation of unused stairs.

0

% of Glazing & Floor Area Base Case vs Project

CS-2009 EAp2:Minimum Energy Performance
posted by  Dana Guzman  on 

Hi, I am new to LEED and looking at the energy model submitted by our consultant for the compliance on EAp2. I have a basic question.

1
Fri Jun 17, 2016, 3:00 am

Demonstrate Savings for CRAC Units

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Gabriela Crespo  on 

Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES.

1
Sat Aug 6, 2016, 6:33 pm

Product type classification

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Raquel Ortiz  on 

Hello, I have a project where a Stonhard flooring system will be installed, like a terrazzo floor characteristics, The system has a hardener for two components coating and a quartz aggregate, the

4
Tue Jul 25, 2017, 8:06 pm

Showers & Changing Facilities

CS-v4 LTc6:Bicycle facilities
posted by  Edna Urias  on 

We were wondering if a Core & Shell building will be subdivided in a future for 2 tenants, do we have to consider shower facilities at 100 feet from each main entrance ?

4
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Fri Jun 16, 2017, 7:24 pm