Baseline system selection
NC-v4 EAp2:Minimum energy performanceposted by Gaston Michaud on
Hello everyone, We are working with a building that has a complicated geometry, and the selection of the baseline system is not that evident.
In the prelimary review
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by jorge calderon on
In the prelimary review comments to achieve this credit we recive the next comment: "Provide supplemental calculations confirming that sufficient shower facilities have been provided to serve all F
DCV
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Hallo, I am reading Section 6.2.7 ASHRAE 62.1-2010, and it is not clear to me if the building needs to install DCV.
Ask about light and views Index
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Jose Alfonso Vergara Vasquez on
Hi , I wonder what happens when you have more windows than is required and the index exceeds the recommended? Thanks.
SRI Non-roof
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by MARIA ESTHER LAMADRID on
Hello, does anyone know if it is aceptable to use sri values of concrete from the guide for a crusher fine concrete or it need a test to be accepted? Thanks
Alternative Compliance Path
NC-v4 EAc2:Optimize energy performanceposted by Gabriela Mena on
Hi, We are working in a Core and Shell project that was registered after april, 2016, from that date to comply with the pre requisite we need to achieve at least 14% savings, We want to know if th
Baseline Fan Power for ECM
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hi, I’m currently working on a pharmaceutical facility in Mexico where unregulated procces loads account for more tan 60% of the energy consumption.
MODEL PROTOCOL
NC-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ on
Hello, My name is Ricardo from Mexico City.
Product type classification
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Raquel Ortiz on
Hello, I have a project where a Stonhard flooring system will be installed, like a terrazzo floor characteristics, The system has a hardener for two components coating and a quartz aggregate, the
Showers & Changing Facilities
CS-v4 LTc6:Bicycle facilitiesposted by Edna Urias on
We were wondering if a Core & Shell building will be subdivided in a future for 2 tenants, do we have to consider shower facilities at 100 feet from each main entrance ?