Forum quick links
Drop off spaces only
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Lewis Hewton on
Hi all Our project has drop off zones only and no new parking on-site.
Water Budget Tool or v4 Outdoor Water Use Reduction Calculator?
NC-v4 WEp1:Outdoor water use reductionposted by Quentin Jackson on
Hi all, I'm doing a LEED v4 NC project in Australia. The LEED v4 manual says to use the Watersense Water Budget Tool (no reference to the v4 Outdoor Water Use Reduction Calculator). My problem w
enhanced refrigeration management credit
NC-v4 EAc6:Enhanced refrigerant managementposted by david gordon on
can someone explain how/why a credit is achieved under the LEEDv4 , enhanced refrigerant management.
Energy Modelling - Australia
NC-v4 EAp2:Minimum energy performanceposted by Quentin Jackson on
We have a Green Building Council in Australia that has a very advanced energy simulation methodology that achieves the same outcomes as the ASHRAE 90.1 process outlined in LEED.
Chain of Custody (COC) - Direct Delivery to Site
CI-2009 MRc7:Certified Woodposted by Christie Rimes on
We are procuring noggings that are FSC certified. The vendor doesn't have chain of custody certification.
BD+C New Construction - New Stadium
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Quentin Jackson on
Hi all, I'm preparing to register a new project (new stadium) and would like to double check that it is a 'single building'.
System 4 for Data Center
NC-2009 EAp2:Minimum Energy Performanceposted by Ameet AA on
Hello, I'm modelling a low-rise data center. According to Appendix G, I should use system 4 (rooftop package heat pump) for reference model.
100% OA VAV Base Building system
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Christie Rimes on
Hi, the CI project I am working on uses only the base building system supply for meeting rooms with between 2 and 8 people.
ASHRAE 90.1 2007 Appendix G System Type 6
NC-2009 EAp2:Minimum Energy Performanceposted by deborah davidson on
We are working on a project which falls under the category of System 6 - Packaged VAV with PFP Boxes for the Baseline Building.
100% Outside Air systems
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Christie Rimes on
The base building HVAC system uses 100% outside air. Therefore there are no return grilles. I am assuming that the requirement for filtration then is not applicable?