NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Lewis Hewton  on 

Hi all Our project has drop off zones only and no new parking on-site.

1
Thu Oct 2, 2014, 5:29 pm

Water Budget Tool or v4 Outdoor Water Use Reduction Calculator?

NC-v4 WEp1:Outdoor water use reduction
posted by  Quentin Jackson  on 

Hi all, I'm doing a LEED v4 NC project in Australia. The LEED v4 manual says to use the Watersense Water Budget Tool (no reference to the v4 Outdoor Water Use Reduction Calculator). My problem w

1
Thu May 4, 2017, 2:46 pm

enhanced refrigeration management credit

NC-v4 EAc6:Enhanced refrigerant management
posted by  david gordon  on 

can someone explain how/why a credit is achieved under the LEEDv4 , enhanced refrigerant management.

1
Tue Apr 28, 2015, 8:23 pm

Energy Modelling - Australia

NC-v4 EAp2:Minimum energy performance
posted by  Quentin Jackson  on 

We have a Green Building Council in Australia that has a very advanced energy simulation methodology that achieves the same outcomes as the ASHRAE 90.1 process outlined in LEED.

1
Thu Apr 13, 2017, 2:56 pm

Chain of Custody (COC) - Direct Delivery to Site

CI-2009 MRc7:Certified Wood
posted by  Christie Rimes  on 

We are procuring noggings that are FSC certified. The vendor doesn't have chain of custody certification.

1
Thu Oct 22, 2015, 1:24 pm

BD+C New Construction - New Stadium

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Quentin Jackson  on 

Hi all, I'm preparing to register a new project (new stadium) and would like to double check that it is a 'single building'.

2
Sustainable Design Leader
HKS, Inc.
LEEDuser Premium Member
40 thumbs up
Wed Jun 7, 2017, 5:41 pm

System 4 for Data Center

NC-2009 EAp2:Minimum Energy Performance
posted by  Ameet AA  on 

Hello, I'm modelling a low-rise data center. According to Appendix G, I should use system 4 (rooftop package heat pump) for reference model.

3
Default Avatar
LEEDuser Basic Member
27 thumbs up
Fri Jun 10, 2016, 9:54 am

100% OA VAV Base Building system

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Christie Rimes  on 

Hi, the CI project I am working on uses only the base building system supply for meeting rooms with between 2 and 8 people.

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Sun Jan 10, 2016, 10:08 pm

ASHRAE 90.1 2007 Appendix G System Type 6

NC-2009 EAp2:Minimum Energy Performance
posted by  deborah davidson  on 

We are working on a project which falls under the category of System 6 - Packaged VAV with PFP Boxes for the Baseline Building.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Jan 6, 2016, 2:46 pm

100% Outside Air systems

CI-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Christie Rimes  on 

The base building HVAC system uses 100% outside air. Therefore there are no return grilles. I am assuming that the requirement for filtration then is not applicable?

2
Thu Sep 10, 2015, 11:37 pm