Forum quick links
Non potable water reservoir - WEc1 -NC 2009
NC-2009 WEc1:Water Efficient Landscapingposted by Muriel Alvarez on
We are certifying a project NC 2009 and we are counting in our credit with a non potable reservoir outside the LEED Boundary but is within the limits of the property.
Natural Ventilation modeling question
NC-2009 EAp2:Minimum Energy Performanceposted by Billy Condor on
Hello! An educational building will have no AA for its classroom, workshops and labs (mainly 90% of the project area), as all these areas will be naturally ventilated (complying with section 5.1 o
Retail (other than mall) or Enclosed Mall
Retail-CI-v2009 EAc5:On-site renewable energyposted by Geraldine Assmus on
I'm certifying a project which is located within a mall, it has access from the street and from inside the mall.
Major renovation historic district includes off-site green area
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Veronica Reed on
Hello We are working on a major renovation project on a 1890's historic building in a very dense historic district.
How to model electric wall heaters in PRM energy model
NC-2009 EAp2:Minimum Energy Performanceposted by Veronica Reed on
Hello, We are renovating a 1905 two-story small historical landmark building as a 12 room boutique hotel, thus cannot include HVAC systems due to planning and preservation restrictions, and the lo
MR credit: Building Disclosure
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Francisca Herrera on
In relation to the Educational Session on EPD that you lead through USGBC, can you please tell me if the EPD compliant with LEEDv4 that you cover through this course, requires that the program unde
Open mall shopping centre baseline model
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
I'm currently working in a project of a shopping centre (common areas + tenant areas) pursuing LEED certification (Core&Shell).
About Existing Building for Retail
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Esteban Martinez on
Hello, we are working on a existing building retail project, which has 43720.42ft2 and 31.16ft height with CO2 concentrations between 500 and 600 ppm.
Projects constructed by diferent owners, same property managment
posted by Pedro Urazan on
Hi, A land owner wants to develop 2 buildings in a section of his terrain and wants to sell the rest of the parcels.
Alarm to closed openings
NC-v4 EQp1:Minimum indoor air quality performanceposted by Vitor Tosetto on
Dears, When we have a Naturally Ventilated Space, we can use an alarm to indicate that the openings are close. Someone know if I can use an light alarm? or I must use an sound alarm?