Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Documenting the Pilot Credit with International Standards

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Cesar Ruiz  on 

My project is located in Colombia and I had some trouble finding information about the possibility of using Standards from outside the US in the documentation of the Pilot Credit 44: Ergonomics Str

1
Fri Apr 15, 2016, 8:50 pm

Existing Building Commissioning

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  sebastian castañeda  on 

Hello. I am a student who is interested in learning about the methodology of LEED certification and there are some points that I do not clear.

1
Tue Jun 21, 2016, 5:53 pm

Inconsistent Price Square Meters versus Square Feet

Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protection
posted by  Ben Stanley  on 

We're pursuing this pilot credit for an EBOM project and it looks like the stated price for financial support is inconsistent if your reporting site area in square meters ($0.5 /square meter) versu

0

Brazilian Equivalent Standard

CS-2009 EAp2:Minimum Energy Performance
posted by  Pamela Svetllana Santos Souza  on 

Hello, I'm modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices.

0

Scope of the Pre-requisite in C&S Shopping mall

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Alan Viale  on 

We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.

1
Tue Jun 30, 2015, 8:19 pm

Aeronautical Maintenance Workshop

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gustavo De las Heras Izquierdo  on 

This is a 70,000 sf Aeronautical Maintenance Workshop in Colombia with the following features: -The space is 6 meters height. -There are interior walls 5 meter height.

1
Wed Dec 9, 2015, 7:25 pm

Multiple Buildings or One Building Certificacion

CS-2009 MPR3:Must use a reasonable site boundary
posted by  Paula Hernandez  on 

We have a C&S Project that has two identical buildings in the same parcel.

0

Floors in elevators

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Cesar Ruiz  on 

Hello, Im working on a project that will install the floor finishing in the elevators. Is this area excluded for credit compliance or does the tile used has to fulfill the requirements?

1
Tue Jul 19, 2016, 9:35 pm

Brazilian equivalent standard

CI-2009 EAp2:Minimum Energy Performance
posted by  Aline Luther  on 

I would like to know if there is any Brazilian Standard that can substitute the ANSI / ASHRAE / IESNA Standard 90.1-2007.

1
Tue Jan 17, 2017, 2:42 pm

Zone Calculation Ds% for VAV System

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Marina Andrade  on 

I received this question in IEQp1: "The ventilation calculations indicate that the value of the flow rate of air projected under the condition tested (DS) was modeled as 100% level for each of th

1
Mon Nov 17, 2014, 3:08 pm