Forum quick links
Wall Skirting - or - Baseboards
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Blanca Cespedes on
I have a vinyl baseboard, does it also have to be Floorscore? Thanks,
2 Buildings in the same lot
CS-2009 MPR3:Must use a reasonable site boundaryposted by Guillermo Alonzo on
Hello from Colombia, We have a C&S Project that has two different buildings (Hotel and offices building) in the same boundary.
Demolition records lost
NC-2009 MRc2:Construction Waste Managementposted by Lara Branco on
Hello, I'm working on a project that has lots of demolition phases, because it depends on the expropriation of several buildings. The first demolition occurred in 2011, when the project wasn't yet
ieqc8.1 x ieqc 8.2
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by GISELA FARHAT DE ARAUJO on
to achieve this credit we must have won the ieqc8.1 credit? or credits are independent?
Supermarket in a small neighbourhood
NC-2009 SSc2:Development Density and Community Connectivityposted by Heraldo Muñoz on
Hello, My name is Heraldo and I am certifying a Supemarket under LEED Retail NC 2009 This supermarket is being constructed in a shopping center that is close to a little neighbourhood. We are a
Calculation
NC-v4 EAc7:Green power and carbon offsetsposted by Vitor Tosetto on
Dear All, I have a doubt about calculation of quantity of REC. I believe you can help me. Using the Example 1 (in page 460 of v4) my project will consume 1,98 MWh per year.
EBOM Project Occupancy Doubt
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi everyone, I’m working on a project and I have a doubt about occupancy in the EBOM. After the measurements, we found that the air conditioning system does not meet the external ventilation lev
100% On site Infiltration
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Rodrigo Tonda on
Hello, we are working on a previously developed site with existing imperviousness less than 50% (Option 1, case 1).
Withered grass
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Gustavo De las Heras Izquierdo on
Our client has planted a mixture of grass species in a vegetated area. Some of the species have withered and only one has remained and keeps growing.
VRF system
NC-2009 EAp3:Fundamental Refrigerant Managementposted by GISELA FARHAT DE ARAUJO on
We are using the vrf system on a project. Should i put as type of equipment Split AC or should i chose the "others" option?