NC-2009 EAp3:Fundamental Refrigerant Managementposted by GISELA FARHAT DE ARAUJO on
We are using the vrf system on a project. Should i put as type of equipment Split AC or should i chose the "others" option?
Speech Privacy on HC
Healthcare-v2009 IEQc2:Acoustic environmentposted by Saymon Grauppe on
Hello. There's another doubt now about Speech Privacy accoeding items 4.4 and 4.5 guide 2010 FGI, where comments Enclosed Rooms and Open-plan spaces. So, for Enclose Rooms what situations are appl
Social equity within the community
NC-v4 INc1:Innovationposted by Miriam Ramirez Baumgarten on
Hi, Our project is pursuing the Pilot credit "Social equity within the community" with Option 1: Complete The SEED Evaluator Parts 1 and 2.
Deadline for Appeal
posted by Marcio Alberto Casado Pereira on
Hi Folks, We received the final decisiona on a very complicated industrial building we are pursuing certification for and EAp2 and IEQp1 were denied.
Core & Shell Retrofit
CS-v4 SSc1:Site assessmentposted by Juliana Malho on
I'm wondering if the credit is achievable by retrofit projects.
Energy Star Alternative
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Cesar Ruiz on
A refrigerator labeled 'California Energy Commission Certificated' is valid as an alternative for an Energy Star qualified equipment?
Exempt area of 10% in a Group Project
posted by Gabriel Frasson on
We have a site that contains two buildings that are being certificate as a campus project. In the ground floor of Tower A there are some stores that we want to exempt of the certification project (
LEED V4 - TENANT SPACE ENERGY MODELING
Retail-CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi, Regarding the Energy Performance Calculator that should be used instead of Table 1.4, my questions are: 1.
AHUs unable to meet case 1 or case 2
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Patrick Murisset on
Hello. I coordinated a project in which the IEQp1 was audited.
Diverse uses located within LEED project boundary
CS-v4 LTc6:Bicycle facilitiesposted by Ricardo Sá on
I'm working on a shopping center development that will include at time of occupancy more than 10 diverse uses within project boundary.