NC-2009 SSp1:Construction Activity Pollution Preventionposted by Vanessa Montezuma Ramos on
Hi, we have some doubts about the equivalency of the ESC plan according to our local standards.
Natural ventilation on a hangar
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Renato Sandoval on
I am working on a hangar ventilated naturally by a clerestory on the roof top. This project would be applicable to the credit IEQ.c5 ?
Offsite donation compensation
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Cesar Ruiz on
I have a project with a large previously developed area.
cardboard and paper
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Emmanuel Pauwels on
We are doing a waste audit and we evaluate metals, mixed paper, cardboard, glass, plastics, batteries, and fluorescent lamps.
PIf2 form filling
CI-2009 MPR7:Must comply with a minimum building area to site area ratioposted by Lorenna Lobo on
While filling the PIf2 form, in "site characteristics" it asks what is the total site area within the LEED project boundary, but the project is just a tenant space, should I put 0?
WEp1 calculator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Muriel Alvarez on
Dear Since I have a problem with BETA version for WEp1, the form did not calculated the percentage correctly, I´ve decided to use the v06 form calculator, well...
DCV vs IEQp1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi everyone! I have a project that the system works with outside air demand according to the CO2 sensor.
Views
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Antonio Macedo Filho on
I would like to know if there is a maximum obstruction height of views for option 1.
Sediment trap outside the project boundary
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Mesquita on
It plans to build a building in a very broad field of the same owner. The LEED Boundary was defined based on the area that is planned to disrupt.
PI Form 2: MPR7
CI-2009 MPR7:Must comply with a minimum building area to site area ratioposted by Aline Luther on
For a project of a commercial interior (commercial office in a commercial building) the gross floor area correspond to the total area of the office?