STC ratings of standard materials?

NC-v4 EQc9:Acoustic performance
posted by  Erin Holdenried  on 

Hello - Is there a resource available with published STC ratings for standard/generic materials?

Thanks!

1
Thu Jun 28, 2018, 5:32 pm

Service Hot Water - modeling the circulation pumps for this system

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings,

Regarding modeling the Service Hot Water (SHW) for a project assigned to System 5, our approach was:

1
Mon Apr 2, 2018, 12:37 am

Advertisements in Exterior Lighting

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings,

We are modeling a KFC fast food restaurant.

As everybody is aware there are illuminated advertisement in the outdoor walls and some ad signs on the roof.

1
Wed Jan 17, 2018, 3:50 pm

Baseline Design Air Flow - System 5

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

The project we are modeling belongs to System 5. There is however no cooling needed or designed.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Nov 8, 2017, 7:54 pm

occupied area

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  ilkyaz ceren güçlü  on 

I'm working on a work center project which is located in Moskov, Russian Federation. I have a problem with area which is described as a regularly occupied area.

1
Mon Oct 20, 2014, 10:55 pm

Commissioning of DATA Centers

Data-Centers-NC-v4 EAc1:Enhanced commissioning
posted by  Vassil Vassilev  on 

Greetings, There is a question from the Owner of Data center in respect of the forth comming commissioning process for his project. The question is related to the specific IT equipment and the spec

1
Tue Aug 29, 2017, 4:34 pm

n/a

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Anastasia Makarenko  on 

Hello all, I am confused how to identify one product that is going to be used on a concrete slab inside our project building.

1
Fri Nov 27, 2015, 8:29 pm

Baseline Garage Ventilation

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, ASHRAE 62.1-2007 establishes a ventilation exhaust rate for garages of 0.7 cfm/sq.ft. Our project has lower rate and besides it applies a CO control settings of 20mg/m3. The question is:

0

Distance from windows to area

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Rustem Saitov  on 

Hi, We are taking 3rd option, measurement to show compliance with the credit requirements. The text of the credit does not postulate when a regularly occupied area can be considered daylit (for in

1
Mon Jun 27, 2016, 1:48 pm

Exterior smoking policy

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Andrey Tsvetkov  on 

Dear all, We have a question about exterior non-smoking policy on the project NC.

1
Sat Aug 26, 2017, 8:38 pm