Commercial Interior; EAc1.3
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi Marcus, Could you please advice me about the following situation: Regarding Option 1 of credit EAc1.3 of CI, the reviewers are requesting an extra CO2 sensor to be added for the densely occupied
occupied area
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by ilkyaz ceren güçlü on
I'm working on a work center project which is located in Moskov, Russian Federation. I have a problem with area which is described as a regularly occupied area.
Commissioning of DATA Centers
Data-Centers-NC-v4 EAc1:Enhanced commissioningposted by Vassil Vassilev on
Greetings, There is a question from the Owner of Data center in respect of the forth comming commissioning process for his project. The question is related to the specific IT equipment and the spec
Garage ventilation - Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, There are some more details about this issue, for which I'd appreciate very much some clarifications. Regarding the modeling approach for garage ventilation in the Baseline, it should fo
Exterior lighting not yet designed
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The project we are modeling at the moment is supposed to have exterior lighting for the facades, some parking lots and some walkways. The exact LPD however is still to be calculated and
Baseline Garage Ventilation
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In our project (registered as per LEEDv2009) there are several garage ventilations. According to ASHRAE 62.1-2007, the garage exhaust rate is to be sized to 0.75 cfm/ sq.ft.
Baseline Hot water pump power for Purchased heat
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The project we are modeling follows LEDD v3 - 2007 (System 7) and the heating source is purchased heat. There are two question related to this issue. 1.
Baseline Chiller plant - System7
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, Could you please provide some advice to the following case (the building belongs to System 7): 1.
Lagre building modeling suggestion
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, The project we are modeling is a huge one - a little more than 900 000 sq ft and it is not C&S.
Cooling plant modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
In the project we are modeling the cooling plant which serves the production area and the buildings' HVAC systems is one and the same.