Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

water bills received every 3 months

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Agnieszka Rylska  on 

Our project receives water bills including water usage every 3 months.

1
Wed May 18, 2016, 5:12 pm

shared waste area

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Agnieszka Rylska  on 

I am working on two projects which will be certified separately. They are located next to each other and they share waste area and waste bins.

1
Thu Jul 6, 2017, 6:33 pm
1
Wed Apr 1, 2015, 5:19 pm

Use of C&S Commissioning documentation

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Izabela Kwiecinska  on 

Hi Everyone, We are working on a building that already got LEED C&S certificate in 2012 and now aims to get EBOM.

1
Fri Feb 10, 2017, 8:56 pm

Previous coal mine area

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Agnieszka Rylska  on 

Is a site which is located on a teritory of a previous coal mine considered perviously developed?

1
Fri Nov 27, 2015, 4:53 pm

Exterior covered spaces

Schools-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Aneta Firląg  on 

We want to use paving block as one of the hardscape surfaces.

1
Sun Aug 27, 2017, 12:50 am
1
Thu Feb 11, 2016, 5:53 pm

Green Building Education Program

EBOM-2009 IOc1:Innovation in Operations
posted by  Agnieszka Rylska  on 

Is providing leaflets in the reception of the building and case study on the owner's website enough for the Green Building Education Program?

1
Mon Oct 17, 2016, 1:30 pm

Sensors calibration during the performace period

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Agnieszka Rylska  on 

Is it necessary to calibrate sensors during the performance period even if the manufacturer’s recommended interval didn't pass yet?

1
Thu Dec 10, 2015, 3:18 pm

revolving doors and side entrances

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Agnieszka Rylska  on 

I am working on a project (shopping mall) that will have revolving door as the mail entrance and it will be equipped with a permanent walk-off system.

1
Sat Jun 18, 2016, 1:59 pm