Forum quick links
Software model energy
CS-2009 EAp2:Minimum Energy Performanceposted by gabriel Morales on
Hellow We are developing an energy model for CS 2009 building and we have been offered a sfoftware SEFAIRA and we want to know if it is approved by the GBCI, to document and EAC3 EAp2.
LEED BD+C 2009 vs v4
posted by MARIA FERNANDA VILLANUEVA RAMOS on
Hi, I'm working on the certification of a high school, it would be my first certification. I became a LEED AP BD+C with the v4, but I have been reading that almost all the projects get certified wi
Role
posted by Gustavo De las Heras Izquierdo on
Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant? Our experience outside the
Leed Footprint exceeds leed Boundary
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Jorge Lopez de Obeso on
Hi, I'm having some problems with a project.
Appendix G Oversizing
CS-2009 EAc1:Optimize Energy Performanceposted by Jorge Torres-Coto on
I have a reviewer requesting that we oversize the PROPOSED case for a "possibly conditioned in the future" warehouse. We have usually modeled the BASELINE case and PROPOSED case identical, then ove
Robotic Parking Garage Ventilation
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Gabriela Mena on
Hi, We have designed a project in Mexico which includes 5 levels for parking garage but it is a robotic parking, we are including a small ventilation fan for each level that provides approx 0.1 cf
Option 1 Skylights
CS-v4 EQc4:Daylightposted by Edna Urias on
We are installing polycarbonate skylights on an industrial plant Core & Shell project.
No exposed soil - how to comply with ESC?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Michael E. Edmonds-Bauer on
We have a small project that consists af an existing one level building that will have an major renovation.
Commissioning Requirements Off-site
posted by Alicia Villanueva on
Dear all, We are choosing to follow the option of off-site space but funded by the project for this credit. The location is an existing building near the project site.
Document no materials and earn the credit
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by LEED Pro Consultant on
Hi, we are working in a Cold dark shell, therefore interiors and fit outs will not have any finish.