Forum quick links
n/a
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by MARIA ESTHER LAMADRID on
How should i classify an elastomeric butyl rubber sealant- sealant tape used in the metal roof
Wastewater
NC-2009 WEc3:Water Use Reductionposted by Alejandro Macias on
I m using the "water use reductions calculator" to document the WEp1 and WEc3. But in the project im working we will be reusing waste water for the WC and urinal flushing.
ERV
Homes-v4 EQp1:Ventilationposted by Gustavo De las Heras Izquierdo on
Has anyone installed an ERV ventilation system? Does it need to be Energy Star certified or this requirement is only for extractors?
MODEL PROTOCOL
NC-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ on
Hello, My name is Ricardo from Mexico City.
Desktop C02 Monitors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Diego Garcia on
Hi, We are currently working on an office building, we want to achieve IEQ cr1, by installing C02 monitors in all spaces.
Project Mexico
NC-2009 PIf4:Schedule and Overview Documentsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .
Tenant submetering
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Gustavo De las Heras Izquierdo on
I’ve read in the Bird’s Eye View Section that “Tenant submetering would not alone qualify for this credit. […]”.
Manufacturing process
NC-v4 EAp2:Minimum energy performanceposted by ignacio furniés on
My question is regarding the EAp2 and EAc3, our project consists of a palm oil manufacturing facility.
Product type classification
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Raquel Ortiz on
Hello, I have a project where a Stonhard flooring system will be installed, like a terrazzo floor characteristics, The system has a hardener for two components coating and a quartz aggregate, the
Showers & Changing Facilities
CS-v4 LTc6:Bicycle facilitiesposted by Edna Urias on
We were wondering if a Core & Shell building will be subdivided in a future for 2 tenants, do we have to consider shower facilities at 100 feet from each main entrance ?