EKOenergy labeled I-RECs
Retail-CI-v4 EAc6:Green power and carbon offsetsposted by Raissa Petri on
Hello,
May I use EKOenergy instead of I-RECs for this credit?
Or EKOenergy labeled I-RECs instead of "REC Brazil" labeled I-RECs?
Thank you!
Regular Building Occupant
posted by Luiza Junqueira on
How do I find out the regular building occupant on a multi tenant building for ARC?
Energy Star Equivalent
Retail-CI-v4 EAp2:Minimum energy performanceposted by Luiza Junqueira on
Hello,
How do I find out if my local energy label (Selo Procel) is equivalent to energy star?
renewing the certification
Retail-CI-v4 EAc6:Green power and carbon offsetsposted by Raissa Petri on
Regarding the following:
Option 3. design for flexibility- Acessible ceiling system
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Lara Branco on
The project I'm working on will leave all the ceiling infrastructure apparent, without the use of ceiling tiles (except a few acoustic panels). Therefore all the lighting, plumbing, etc.
Construction Phases
Hospitality-NC-v4 MPR1:Must be in a permanent location on existing landposted by Larissa Murakami on
We have a project to be registered in LEED NC for hotels. The project consists of several towers and some units of chalets.
materials not used in the original construction are verified in the re-evaluation of the certification?
posted by ANDREZA PASSOS on
I would like to know if Unused Materials, when purchased by the company along with the LEED guidelines, can cause owners to lose certification during the renewal evaluation of the certificate?
Elevators with regenerative braking - EAp2 form
CS-2009 EAp2:Minimum Energy Performanceposted by Pamela Svetllana Santos Souza on
Hello, We are modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices. My question is about the Minimum Energy Perfomance credit form (EAp2).
remote access
NC-v4 EAc3:Advanced energy meteringposted by Antonio Macedo Filho on
I'd like to know if the BMS collecting the meter data would already meet the requirement of remote access to the data or this data should be avaiable for all ocupants.
Habitable buildings
ND-Plan-v4 MPR3:Must comply with project size requirementsposted by Antonio Macedo Filho on
Hi, Eliot!
The project must have at least two habitable buildings, but it would necessarily residential buildings? Would this "habitatable" word be in the sense of residence itself?