Forum quick links
Vegetation under solar panels
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Cesar Ruiz on
Hello, We are working on a project which is going to have almost all of its roof covered by solar panels.
Emission Reporting (ISO 14064/ Portfolio Manager)
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Esteban Martinez on
Hi, We are working in a project in Colombia.
Documenting the Pilot Credit with International Standards
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Cesar Ruiz on
My project is located in Colombia and I had some trouble finding information about the possibility of using Standards from outside the US in the documentation of the Pilot Credit 44: Ergonomics Str
About Existing Building for Retail
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Esteban Martinez on
Hello, we are working on a existing building retail project, which has 43720.42ft2 and 31.16ft height with CO2 concentrations between 500 and 600 ppm.
Projects constructed by diferent owners, same property managment
posted by Pedro Urazan on
Hi, A land owner wants to develop 2 buildings in a section of his terrain and wants to sell the rest of the parcels.
Private Green Roof
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Luis Miguel Diazgranados on
Hi, I am working in a C&S LEED project and have doubts about vegetation that it expect to use for meet the 25 % of open space area.
Social equity within the community
NC-v4 INc1:Innovationposted by Miriam Ramirez Baumgarten on
Hi, Our project is pursuing the Pilot credit "Social equity within the community" with Option 1: Complete The SEED Evaluator Parts 1 and 2.
LEED V4 Rating System : Game Arcade
posted by MKK LEED on
Hi All, We are working on a C&S Mall Project, and one of the tenants wants to certify they space, their space is going to be a game arcade with some small attractions (bumper cars and other st
Offsite donation compensation
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Cesar Ruiz on
I have a project with a large previously developed area.
Different HVAC system in baseline than proposed design- C&S
CS-2009 EAc1:Optimize Energy Performanceposted by Ron Dean on
I am doing the energy model for a CS project.