Forum quick links
Unisex Toilet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by sebastian castañeda on
We are working on LEED NC 2009 for a new 9 stories building. There is one unisex toilet at each office level. How I determine the number of people will use those toilets?
Different contractors for earthworks and construction
NC-v4 SSp1:Construction activity pollution preventionposted by Vanessa Montezuma Ramos on
Hi everyone,
Control monitoring in tenant spaces
CS-v4 EQp1:Minimum indoor air quality performanceposted by Ron Dean on
Hello,
IEQp1 - calculator
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by sebastian castañeda on
My greetings I am working through In the IEQp1 Minimum Indoor air quality performance and I need orientation with respect to systems with natural ventilation. I need to know if exists a calculator
Scope in a C&S shopping mall
CS-2009 EAp2:Minimum Energy Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating.
Inconsistent Price Square Meters versus Square Feet
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Ben Stanley on
We're pursuing this pilot credit for an EBOM project and it looks like the stated price for financial support is inconsistent if your reporting site area in square meters ($0.5 /square meter) versu
Withered grass
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Gustavo De las Heras Izquierdo on
Our client has planted a mixture of grass species in a vegetated area. Some of the species have withered and only one has remained and keeps growing.
Lavatories in special conditions
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Vanessa Montezuma Ramos on
Hello everyone! I am currently working on a project for a university campus. This is a three story building, with laboratories for students and researchers.
Scope of the Pre-requisite in C&S Shopping mall
CS-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.
supplier and products UF
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Jose Antonio Kovacevic on
To comply with IEQc4.4 credit in LEED NC It has been evaluated local furniture suppliers of MDF, used for new buildings and the most regular composite woord and agrifiber for new buildings. In Peru