Forum quick links
Has anyone earned this pilot credit on a core and shell building?
Pilot-Credits WEpc94:No Cooling Towerposted by Jason Packer on
We're working on a 15-storey core and shell mixed use office building in the Pacific North West.
Controlled Burn?
NC-v4 SSc2:Site development - protect or restore habitatposted by Norma Lehman on
Has anyone ever used a controlled burn to eliminate invasive species?
Define available buildable space
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Cindy Cordo on
In BD+C-v4.1 LTc4, Option 1, Table 1a, in calculating the FAR for nonresidential uses, does on-site parking need to be included in the overall available acreage of the available building space
ASHRAE 90.1-2010 Mandatory Requirements in Existing Buildings
NC-v4 EAp2:Minimum energy performanceposted by Ashley Wisse on
EAp2 requires adherence to ASHRAE 90.1-2010 Mandatory Requirements at Section 5.4 and elsewhere.
UL Certified EPDs.
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Susan Di Giulio on
Hi,
Dimmed Fixtures & Demande Response
NC-v4 EAc4:Demand responseposted by on
We are designing an Assisted Lighting project, where many of the common areas will be dimmed by about 40%. What happens when we receive a DR signal? Since we're already dimmed, wil
Mixed Use apartment complex
Mid-Rise-v4 LTc4:Community resourcesposted by katie nguyen on
I am working on an apartment building that will have retail, offices, and restaurants on the bottom floor. Can I count these uses?
Can we still get points with City's proposed Bicycle Network?
NC-v4.1 LTc6:Bicycle Facilitiesposted by Arega Mehrabian on
We are currently designing Aquatic center near Pioneer High School. there are proposed/Adopted Bike Network passing our site. is that goint to be acceptable?