Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

LEEDv4.1 Acoustic - Can residential projects no longer achieve this credit?

LEED v4.1 Discussion Forum
posted by  Sophie Kerr  on 

I noticed LEED v4.1 removes mention of residence and residential. Table 1 removes all 'residence' reference and table 2 removes 'apartment and condominium'.

1
Wed Jan 8, 2020, 10:18 pm

Exterior Lighting Requirements

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Rick Tucker  on 

With the advances in exterior LED lighting drivers and controls, would it make sense to look at dimming exterior lights down to say 10% in lieu of turning them off completely from midnight to 6am a

0
4
Executive Associate - Lead Design
Rushing Air Treated Air Systems
LEEDuser Basic Member
0 thumbs up
Sun Jan 5, 2020, 3:34 pm

NC-v4.1 LTc8: Electric Vehicles

NC-v4.1 LTc8:Electric Vehicles
posted by  Brian Johnson  on 

Hello, I have a question regarding the LTc8 Electric Vehicles credit.  If our project only requires 2 parking spaces to have ESVE installed, does that mean each parking space must have an inde

1
Wed Jan 15, 2020, 1:13 pm

Points for ACP and as Pilot credit

Pilot-Credits MRpc102:Legal Wood
posted by  Keith Robertson  on 

We have registered our Canadian project for the Legal wood Pilot ACP.

2
Thu Dec 19, 2019, 9:18 am

Credit Form - 25% vegetated requirement (Form has Error)

NC-v4 SSc3:Open space
posted by  Amarpreet Sethi  on 

The LEED User Guide clearly states in Equation 2.

2
Artist, Curator, Writer
Teresa Stern Arts
LEEDuser Basic Member
20 thumbs up
Wed Dec 18, 2019, 9:35 pm

Define "transit route" for the extra point gained with no on route providing more than 60% of the documented levels

NC-v4 LTc5:Access to quality transit
posted by  Evie Bird  on 

Pertaining to this extra point in LEED v4 -"Projects served by two or more transit routes such that no one route provides more than 60% of the documented levels may earn one additional point, up to

8
Default Avatar
Founder and CEO
Greenwave Global Consulting (GGC)
LEEDuser Basic Member
8 thumbs up
Tue Dec 17, 2019, 11:08 am

CxA from early-design/peer review team?

CI-2009 EAc2:Enhanced Commissioning
posted by  Frances Yang  on 

Does anyone know if the CxA would be allowed to come from the same firm as the team that performed design up through 100%DD and then peer review of the design-build trades that took over desig

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Dec 16, 2019, 8:44 pm

Documentation Required for IP Credit

Schools-NC-v4 IPc1:Integrative process
posted by  Cora Kenrick  on 

Hi Fellow LEED Users,

 

Has anyone submitted this credit yet and what documentation is required.

I'm new to LEED and this credit.

 

11
Wed Dec 11, 2019, 2:58 pm