LEED v4 CI EAb Opt. Energy Perf. : Option 2 : AEDG Maximum Project Size requirements

CI-v4 EAc2:Optimize energy performance
posted by  Kristen Callori  on 

Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant.

1
Fri Aug 9, 2019, 8:53 pm

"Meeting but not Exceeding Local Zoning requirements" and Building Type based on local zoning

CS-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Edgar Arevalo  on 

1) I have been carefully looking over the description for achieving this credit under Case, Option 1, and what I find confusing is how it says in the handbook, "Size parking capacity must meet but

0

minor improvements within the water body body buffers: grade changes necessary to ensure public access

NC-v4 LTc2:Sensitive land protection
posted by  Louise Schlatter  on 

Hi.  I have a question about minor improvements within the water body body buffer.  It says "grade changes necessary to ensure public access."  We have a small First Order strea

3
Fri Aug 9, 2019, 2:15 pm

Option 1 - Flushout of Non-Occupied Spaces

NC-v4 EQc4:Indoor air quality assessment
posted by  Mike Bahr  on 

My project is a mid-rise building with the lower 5 levels being open air parking. Is that required to be flushed, and meet humidity and temperature requirements?

1
Fri Sep 13, 2019, 3:19 am

LEED V4.1 EBO+M Minimum Program Requirements

LEED v4.1 Discussion Forum
posted by  Ben McEwen  on 

I cannot verify that LEED V4.1 EBO+M requires fulfillment of the usual MPRs that have been required for previous versions (permanent location, site boundaries, etc.). V4 do

0

Existing Building Fire Escapes - Building Square-footage

NC-2009 PIf2:Project Summary Details
posted by  Katherine Norris  on 

Our existing building relies on (2) metal fire escapes for emergency egress that we are not modifying.  They are full exterior, self supported, and only connect to the building with later

1
Wed Aug 7, 2019, 5:18 pm
1
Thu Jan 16, 2020, 12:20 pm

Waste Management Coordinator

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Akshay Padwal  on 

The person (program manager) who is coordinating waste management, do they have to be LEED certified? 

2
LEED Services Director
Group14 Engineering, Inc.
LEEDuser Premium Member
47 thumbs up
Wed Aug 7, 2019, 12:05 pm

1 EV charging station for 2 spaces and Vehicle Fueling Capacity per Station

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Edgar Arevalo  on 

I was informed that the LEED project in question has 1 charging station and two reserved parking spots.  Am I to assume that this station has two charging cables, one for each spot, or should

5
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Tue Aug 6, 2019, 8:12 pm

EQpc44

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Lou Niles II  on 

We pursued this pilot credit on one of our interior projects and did well with only one set of comments.

1
Mon Feb 24, 2020, 8:39 pm