Furniture built with salvaged trees
NC-v4 EQc2:Low-emitting materialsposted by Alara Brinton on
We have several furniture items that are being built for our new office from salvaged trees around our city that would otherwise be destroyed (dutch elm disease).
Heat Island credit much easier?
NC-v4 SSc5:Heat island reductionposted by Elizabeth Powers on
Is anyone else finding this combined heat island credit much easier to get than expected? Given that the thresholds were raised for non-roof paving SR, I understood that additives to lighten
Entire building vs. parts of the building within scope of work
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
In NYC, there is building that the clients are looking to see if it complies with undergoing LEED certification under a Local Law. They pretty much ask for what could be included in the scope
Rainwater and cooling coil condensate
NC-v4 WEc3:Cooling tower water useposted by Rob Hink on
Good afternoon,
Form Relase Compound
NC-v4 EQc2:Low-emitting materialsposted by Irene Chung on
Hi,
Can anyone please confirm if form release compounds need to meet both VOC limits and emissions requirements? If so, does anyone know of any compliant product?
Main Street Program as a Priority Designation
NC-v4 LTc3:High priority siteposted by Teresa Stern on
Our project is located 2 blocks from the nearest historic district, but is within the Downtown area encompassed by the local Main Street Program.
LEED Project Boundary on Contract Documents
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Mark Zoeteman on
Is it required in v4 BD+C to show LPB on civil and architectural contract documents? Project includes renovation and addition to an existing building.
Pilot-Credits EQpc124: Performance-based indoor air quality design and assessment
CI-v4 INc1:Innovationposted by Amanda Lehman Garvey on
Looking to pursue Tier 2, Path a.
Has anyone successfully submitted this credit? Hoping to understand what the reviewers may be looking for in terms of an occupant survey.
Existing irrigated trees
NC-v4 WEp1:Outdoor water use reductionposted by Megan Leslie on
I am wondering if existing irrigated trees on a university campus that are included in our LEED boundary need to be included in the calculations for Outdoor Water Use Reduction prerequisite/credit.
FSC Certified Laminated to Non-FSC Cork Material
NC-2009 MRc7:Certified woodposted by Bobby White on
I'm just getting started working with this and am trying to find out if FSC Certified material credits can be applied if Non-FSC cork is laminated to it. - Thanks.