Reporting Clarification for Waste Hauler/Transfer Station

NC-v4 MRc5:Construction and demolition waste management
posted by  Melissa Johnston  on 

Hello,

I work for a hauling company/transfer station and am a LEED Green Associate.

7
Mon Oct 29, 2018, 9:42 pm

Building Type not listed in Default Occupancy Table

NC-v4 LTc6:Bicycle facilities
posted by  Tim Nabholz  on 

I am working on a justice centre (court house) project here in Canada and am wondering which occupancy type to use.

4
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Mon Oct 29, 2018, 5:04 pm

Target Finder

NC-v4 EAc2:Optimize energy performance
posted by  Edgar Arevalo  on 

I am working on a sanitation maintenance garage, which is a major renovation project, and I plugged the necessary info at EPA Target Finder.

3
Default Avatar
Director of Sustainability
Edifícios Saudáveis Consultores (503 910 767)
LEEDuser Basic Member
79 thumbs up
Mon Oct 29, 2018, 3:32 pm

Fan power in Baseline

NC-v4 EAp2:Minimum energy performance
posted by  Tanushree Charan  on 

I wanted to understand what is the ballpark for the fan energy consumption for the ASHRAE 90.1 Baseline model for LEED v4. 

1
Mon Oct 29, 2018, 2:38 pm

A great way for 2009 projects to bridge the gap to version 4

Pilot-Credits MRpc84:v4 MR credit category for v2009 projects
posted by  Elizabeth Powers  on 

I'm just adding a comment here to participate in the forum per the pilot requirements.  Our project pursued this option as a great way for one of the last 2009 projects to be built on a campus

0

Crushed/Decomposed Granite

Schools-2009 SSc7.1:Heat island effect - nonroof
posted by  Danielle Dunn  on 

I see that this question has been asked previously but I received a comment back that our documentation mention decomposed granite but didn't provide and SRI.

1
Fri Oct 26, 2018, 3:14 pm

LEED C&S (sans C?)

CS-v4 MPR1:Must be in a permanent location on existing land
posted by  Thomas Gibbons  on 

Hi folks,

Have a question that I believe relates to Interpretation #10102 and incomplete spaces (though I’m open to suggestions if I’m off-base). 

0

Gross Floor area Question

CI-v4 EQc4:Indoor air quality assessment
posted by  Nancy Henderson  on 

We have a tenant with several full floors being built out in a new core and shell building.  Does the gross SF for the purpose of the flush out need to include what would be considered core sp

1
Thu Oct 25, 2018, 6:45 pm

Membrane Primer VOC – LEED V4 – Healthcare

Healthcare-v4 EQc2:Low emitting materials
posted by  Rebecca Barr  on 

Hi there, we are a fabricator and installer of architectural metal wall panel systems and I was looking for some insight into VOC levels and air and vapour membrane adhesive.  We typically use

0

Chilled Water vs DX System 5 is currently flawed.

NC-v4 EAp2:Minimum energy performance
posted by  Alejandro Vera  on 

At issue, our proposed system (chilled water) is paired against a System 5 (non-residental < 5 floors & 25,000 < SQFT < 150,000) but we are having a problem with the energy modeling wh

3