EBOM-v4 SSc6:Site improvement planposted by Yaretzy Charo on
What does it mean by documentation of existing site conditions?
Asphalt with Recycled content (RAP)
NC-2009 MRc4:Recycled contentposted by Rick Alfandre on
Has anyone used Ashpalt with recycled asphalt? Reading the forums, it seems it will apply, but I'm having trouble determining what possible percentage of recycled content (pre or post consume
Pilot Credit: INpc113 - Informing Design Using Triple Bottom Line Analysis
NC-v4 INc1:Innovationposted by Sophie Kerr on
Hello,
Small Project BoD
CI-2009 EAp1:Fundamental commissioning of building energy systemsposted by Claire Cowling on
I picked up a project in my firm after the first review was compelted. It seems that a BoD was never created for this project, as it is very small and the CxA was hired late.
HPD v2.1 - Statement about Special Conditions when "No" is indicated for Characterized, Screened, or Identified
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
I’m currently reviewing a HPD v2.1 for LEED v4 Building Product Disclosure and Optimization – Material Ingredient Option 1.
Regional material distance calculation method
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Lawrence Rennell on
According to LEED 2009, there were alternate distance calculations available that applied to products shipped by rail or ship.
Option 2: Is there an alternate compliance method being launced under LEEDv4.1
NC-v4 SSc2:Site development - protect or restore habitatposted by Stacey Olson on
It appears under LEEDv4.1 O+M, this credit was removed.
We have a site that is 19.1 acres, which equates to a cost of $332,798.40 at $0.40 / sf - a substantial cost for 1 point.
No issues
Pilot-Credits EApc111:Alternative Performance Rating Methodposted by Maureen Mahle on
I haven't found any major issue for this credit using this PC.
Lighting Power Allowance in Landmarked Building
CI-v4 EAp2:Minimum energy performanceposted by Nita Christopher on
We are attempting to certify a small tenant fit out (7,000sf) in a recently awarded LEED v4 EBOM Gold building with Landmark status.
LEED boundary - urban infill project - LEED V4 C&S
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Thomas Gibbons on
Hi folks,