Forum quick links
Reclaim and use steam condensate requirement for indoor water use reduction
NC-v4 WEc2:Indoor water use reductionposted by Elyse Dufrene on
Can you please clarify what is ment by the requirement for steam system : reclaim and use condensate - 100% recovery and reuse. Tks
LEEDv2009 NC SSc2
NC-2009 SSc2:Development density and community connectivityposted by Lina Khan on
Hello Everyone,
Connectivity within a Big Box Store Shopping Centre
ND-v4 SLLc1:Preferred locationsposted by Tim Nabholz on
What is considered an intersection within a parking lot of a Big Box Store shopping centre.
Alternative Bike Network
Schools-NC-v4 LTc6:Bicycle facilitiesposted by Danielle Waters on
The school zone is located on a road with a 30 mph speed limit sign.
Does IT and AV equipment need to be installed prior to IAQ testing?
CI-v4 EQc4:Indoor air quality assessmentposted by Diana Smiciklas on
Does IT and AV equipment need to be installed prior to IAQ testing? We are moving offices and our IT team will be dismantling and reinstalling AV and IT equipment the weekend prior to our move.
Modeling a DOAS Serving Shell Space
CS-2009 EAp2:Minimum energy performanceposted by Cory Duggin on
We have a fully designed DOAS that provides ventilation to the core and shell spaces of the building. Since the DOAS is fully designed, can we have it provide the ventilation to the shell spa
Appendix G system type for addition
NC-2009 EAp2:Minimum energy performanceposted by Hilary Giffen on
I have an addition to a manufacturing plant. The addition has its own HVAC system so the LEED boundary encompasses just the addition.
No cooling tower in design but core and shell spaces modeled as neutral with cooling tower in energy model.
Pilot-Credits WEpc94:No Cooling Towerposted by Chris Yates on
A project I am working on meets all the requirements for the design (no cooling tower, no use of the latent heat of the evaporative cooling of water, no cooling from a Dist
Historic District in vicinity
NC-v4 LTc3:High priority siteposted by Timothy Hillhouse on
I am working on a project in a rural NC town which has a historic district in its downtown area. Our project is downtown however the historic boundary goes around our block essentially surrou
Rainwater treated in high performance rain gardens and runoff
NC-v4 SSc4:Rainwater managementposted by Nita Christopher on
Project team has selected Option 2 of Rainwater Management Credit. Site is 3.85 acres. Geotech report indicates underlying soils to be clays with little to no infiltration potential.