CARB ATCM and TSCA Title VI Test Results used for IEQc4.4?
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Melanie Blacklock on
My subcontractor has submitted a Test Report showing the MDF has passed the following:
Energy savings from Battery Storage
NC-2009 EAp2:Minimum energy performanceposted by Vinay Shekar on
Hello,
Option 2 HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Aaron Wintersmith on
The credit language for this Option says "provide a separate control zone for each solar exposure and interior space."
Hotel mix use
NC-v4 EAp2:Minimum energy performanceposted by jefferson thomas on
We have a hotel with 4,000 SF of retail at the lower level of a new construction hotel project? How do we sepperate the two projects if they have a central energy plan for chilled water?
Exclusions from Regularly Occupied Spaces for Lab Spaces
CS-v4 EQc4:Daylightposted by Jordan Daniels on
I was wondering if someone can help here. Working on a v4 C&S 5 story building. Some of the tenant space on each floor is laboratory space (40% approximately of each floor).
SSp2 Ruling based on Risk Assessment
Healthcare-v4 SSp2:Environmental site assessmentposted by Donal Dignan on
Hi All, I'm working on a Healthcare v4 project that has detected iron in significant concentrations on the project site and it appears to possibly be a background contaminate but this is still bein
Eco-Friendly worksafe solvents
posted by Robert Marsh on
Removing dust, dirt, allergens, and infection-causing agents like viruses is a key component of a healthy indoor environment and doing it in a Eco-friendly way is best of all the techniques.
Oops - broken chain of custody wood classification?
Pilot-Credits MRpc102:Legal Woodposted by Joanna Switzer on
Discovered in a project a little too late that FSC doors are being procured /handled by a non-FSC U.S.
Would books be considered furnishings for IAQ?
CI-v4 EQc4:Indoor air quality assessmentposted by Lucia M Aguirre on
Looking for some guidance!
Project registration
NC-v4 MPR1:Must be in a permanent location on existing landposted by Kavita Karmarkar on
I am posting this here as this question is not really applicable to any credits / MPR.
Is there a hard cut-off to when a project can register for LEEDv4 New Construction?