Occupant Comfort Survey for residential projects?

NC-v4 INc1:Innovation
posted by  Erica Downs  on 

Under v3, residential projects were ineligible for this credit. Does anyone know if they are eligible under this v4 Innovation credit? Thanks!

2
Design Engineer
LEEDuser Expert
19 thumbs up
Tue Apr 17, 2018, 12:40 am

MRp2 ambiguities

EBOM-2009 MRp2:Solid waste management policy
posted by  Vincent Dupuy  on 

I have 2 issues with this prerequisite:

1
Wed Apr 25, 2018, 11:51 pm

Smoking prohibited on property

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Erin Holdenried  on 

We have a project where smoking is prohibited on the property, is it acceptable for signage to read "No smoking at this property"?  Saying "No smoking within 25ft" would be counter t

1
Tue Apr 17, 2018, 4:34 pm

How to divert 70% of ongoing consumables?

EBOM-v4 MRc4:Solid waste management - ongoing
posted by  David Baker  on 

I have a project that is up for recertification next year and wants to pursue the MR credit for diverting ongoing consumables.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Fri Apr 13, 2018, 2:55 am

Bike Commuting - Lockable Changing Area

Retail-NC-v2009 SSc4:Alternative transportation
posted by  Lyle Axelarris  on 

The project has an employee locker room with an attached single ADA bathroom.  The bathroom is large enough to change in, and is lockable.  However, the door to the locker room is not loc

0

Preschool Occupancy

NC-2009 PIf3:Occupant and Usage Data
posted by  Heather Holdridge  on 

I received a preliminary design phase review comment on a preschool project for this PI form.  We entered identical values for the peak and average transient occupancy because the building is

3
Sustainability Director
Lake|Flato Architects
LEEDuser Premium Member
78 thumbs up
Thu Apr 12, 2018, 10:16 pm

repositioned non-historic building in a historic DISTRICT

CS-v4 LTc3:High priority site
posted by  Gail Napell  on 

we're renovating a NON-HISTORIC building in a HISTORIC district.  new façade, new MEP systems, structural upgrades.  Does this meet the intent of Option 1?

 

1
Tue Dec 4, 2018, 8:02 pm
4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Apr 12, 2018, 3:26 pm

NC-v4 MRc5 Option 2: Clarification of floor area for multi-phase renovation project.

NC-v4 MRc5:Construction and demolition waste management
posted by  Yasha Ogg  on 

I am working on a multi-phase project and I was wondering, does Option 2: Reduction of total waste material (Do not generate more than 2.5 pounds of construction waste per square foot of the b

1
Wed Apr 11, 2018, 1:23 pm
9
Wed Apr 11, 2018, 7:47 am