Forum quick links
Occupant Comfort Survey for residential projects?
NC-v4 INc1:Innovationposted by Erica Downs on
Under v3, residential projects were ineligible for this credit. Does anyone know if they are eligible under this v4 Innovation credit? Thanks!
MRp2 ambiguities
EBOM-2009 MRp2:Solid waste management policyposted by Vincent Dupuy on
I have 2 issues with this prerequisite:
Smoking prohibited on property
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Erin Holdenried on
We have a project where smoking is prohibited on the property, is it acceptable for signage to read "No smoking at this property"? Saying "No smoking within 25ft" would be counter t
How to divert 70% of ongoing consumables?
EBOM-v4 MRc4:Solid waste management - ongoingposted by David Baker on
I have a project that is up for recertification next year and wants to pursue the MR credit for diverting ongoing consumables.
Bike Commuting - Lockable Changing Area
Retail-NC-v2009 SSc4:Alternative transportationposted by Lyle Axelarris on
The project has an employee locker room with an attached single ADA bathroom. The bathroom is large enough to change in, and is lockable. However, the door to the locker room is not loc
Preschool Occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Heather Holdridge on
I received a preliminary design phase review comment on a preschool project for this PI form. We entered identical values for the peak and average transient occupancy because the building is
repositioned non-historic building in a historic DISTRICT
CS-v4 LTc3:High priority siteposted by Gail Napell on
we're renovating a NON-HISTORIC building in a HISTORIC district. new façade, new MEP systems, structural upgrades. Does this meet the intent of Option 1?
NC-v4 MRc5 Option 2: Clarification of floor area for multi-phase renovation project.
NC-v4 MRc5:Construction and demolition waste managementposted by Yasha Ogg on
I am working on a multi-phase project and I was wondering, does Option 2: Reduction of total waste material (Do not generate more than 2.5 pounds of construction waste per square foot of the b
Alternative Complaince for large energy user
NC-v4 EAp2:Minimum energy performanceposted by Vipul Babriya on
Hello,