Forum quick links
Utility Bills for REC Green Power Calculations...
NC-2009 EAc6:Green powerposted by Rick Alfandre on
The link below, fromLEEDuser, indicates that if you can use actual utility bills x 50% x 2 yrs to calculate the required quantity of RECs as opposed to the EAc1 energy model design consumption x 35
Amtrak and Megabus
NC-v4 LTc5:Access to quality transitposted by Sara Zoumbaris on
Our project is shy of the second weekend trip threshold (108) by 1-ride. We are within walking distance of Amtrak, which has regularly scheduled pickups at our location twice a day.
Existing building curtainwall reduced glazing %
NC-v4 EAp2:Minimum energy performanceposted by Wade Cooper on
I have an existing envelope that is a complete curtain wall assembly that is to be replaced. The overall WWR for the building is over 70% currently and is being removed and redesigned to
Gross area v. net area in PI Form 3 and IEQ8.1
NC-2009 PIf3:Occupant and Usage Dataposted by James Bell on
PI Form 3 requires gross area of Occupied Space.
Owner Provided Signage
NC-2009 SSc7.1:Heat island effect - nonroofposted by Summer Minchew on
I have a project that will have owner provided signage (naming signage) mounted to architectural canopies.
Greencircle certified products
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Vanessa Nelson on
Will a Greencircle certified flooring product meet the requirements?
Management of on site runoff at a neighboring retention pond
NC-v4 SSc4:Rainwater managementposted by Jason Garvens on
I'm working on a project being built in a designated industrial park area.
Demand Response Program available but building can't meet requirements
NC-v4 EAc4:Demand responseposted by Jason Garvens on
Can a project still be eligible to apply for the single point for Case 2 if the project's utility does offer a DR program but the project doesn't sign up for it due to the requi
Externally illuminated building signage
NC-v4 SSc6:Light pollution reductionposted by Gordon Wong on
I have a project in Auburn, CA for the California Conservation Corp. The new building will have a stem mounted luminaire that will illuminate the building name. Since this luminiar
Roof Top Patio
NC-v4 SSc5:Heat island reductionposted by Irene Chung on
Hello, 1/4 of my project's roof area is going to be patio that is accessible to occupants. Can rooftop patio be excluded?