Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Service Sink Baseline flow

NC-2009 WEp1:Water use reduction
posted by  Jorge Torres-Coto  on 

I have a project that includes mainly Vocational Classrooms.  As such, each classroom has Service Sink for washing hands after each class (Diesel, Auto Mechanic, Carpentry, Welding, Sheet Meta

0

Retail -Clarifying Reference Guide language indicating "14 days"

Retail-CI-v4 EQc4:Indoor air quality assessment
posted by  Stacey Olson  on 

The LEED reference guide indicates "Retail projects may conduct the testing within 14 days of occupancy." I read this to mean that air sampling can occur up to 14 days post occupancy.

0

Roller Window Shades

NC-v4 EQc2:Low-emitting materials
posted by  Christine Chow  on 

Are interior installed roller window shades included in the credit requirements?

1
Wed Dec 13, 2017, 8:15 pm

Overhead coiling doors

Schools-2009 IEQc8.2:Daylight and views - views
posted by  Danielle Dunn  on 

Can overhead coiling doors count in this credit? Also if you have windows on more than one plane in a room should you take a section at each plane or show those windows in "elevation"?

1
Wed Dec 13, 2017, 3:54 pm

Innovation Credits in v4

NC-v4 INc1:Innovation
posted by  Lissa Spitz  on 

Hi all, I see that several of the old faithful innovation credits are still available in v4, but when I search actual v4 certified projects, I can't find a single one shown on their scorecards.&nbs

5
Tue Dec 12, 2017, 11:28 pm

Small addition to existing building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Edmée Knight  on 

Our project is a small addition (<10% of total building GSF) to an existing building.

1
Tue Dec 12, 2017, 10:19 pm

Recycled non-potable water measurement

NC-v4 WEc3:Cooling tower water use
posted by  Elizabeth (Zeba) Floyd  on 

Our intention is to reuse stormwater and condensate for at least 20% of the make-up water for the Cooling Tower.

1
Thu Jan 11, 2018, 8:21 pm

Fundamental Commissioning Timeline

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Todd Bundren  on 

I am working on a project where the Owner Project Requirements and Basis of Design were created at the appropriate times.

1
Fri Dec 15, 2017, 5:26 pm

Bi-polar ionization

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  Suchi Daniels  on 

Universities and Colleges in Florida have installed bi-polar ionization for multiple purposes.  First, improved energy efficiency, second improved indoor air quality, and third, reduced mainte

1
Wed Dec 13, 2017, 3:56 pm