Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Water Metering (prereq and credit)

Warehouses-NC-v4 WEc4:Water metering
posted by  Ryan McEvoy  on 

If a project installs one meter for the building (essentially collectively metering indoor plumbing fixtures and domestic hot water) and another meter for irrigation water, what are the ramificatio

1
Wed Dec 13, 2017, 4:06 pm

Constuction Waste plan for Option 2

CI-v4 MRp2:Construction and demolition waste management planning
posted by  Deborah Stadler  on 

If a contractor is opting for Option 2 under the Construction and Demolition Waste Management credit, (less that 2.5 lbs/sf) do they still need to plan for Option 1 indicating the 5 streams to obta

1
Thu Dec 7, 2017, 5:00 pm

MR4, MR5 Credit Default Percentage For Unavailable Information

NC-2009 MRc4:Recycled content
posted by  Jack McCaskill  on 

The steel supplier for the structures contractor on our project has gone out of business and thus information regarding MR4 Recycled Content, and MR5 regional materials information is unavaila

1
Wed Dec 6, 2017, 2:21 pm

Is metal furniture - tables and/or chairs required to meet the ANSI/BIFMA testing requirements

Retail-CI-v4 EQc2:Low-emitting materials
posted by  Cindy Davis  on 

My retail project has metal furniture that is powder coated.  it is my understanding that this would qualify as "inherently non-emitting sources" per LEEDv4 and would not be subject to the BIF

0

CS 2009 & CI v4

CS-2009 SSc9:Tenant design and construction guidelines
posted by  Susan Di Giulio  on 

Like Melissa Merryweather, I am writing SSc9 Tenant Guidelines for a LEED v2009 C&S project, and now we are well past the line where any tnenat would have to pursue LEED-CI v4.

6
Default Avatar
Green Building Specialist
U.S. Green Building Council
LEEDuser Premium Member
2 thumbs up
Sat Dec 2, 2017, 6:28 am

EBOM Integrated Pest management - indoor and outdoor

Schools-2009 IDc1:Innovation in design
posted by  Drashti Dhirwani  on 

For a school project, is it possible to achieve two points in ID for Integrated Pest Management from EBOM credit library?

1
Wed Dec 13, 2017, 5:31 pm

LEED v.2009 NC EA Credit 5

NC-2009 EAc5:Measurement and verification
posted by  Andrew Buck  on 

We are designing a Hotel with the following systems:

1
Thu Nov 30, 2017, 5:35 pm

LEED CI project boundary

CI-2009 PIf1:Minimum Program Requirements
posted by  Drashti Dhirwani  on 

I am working on a 125,000 SF CI project, where approximately 2,500 SF space (2 private offices and a kitchen) was designed by a different designer, has a different contractor and is being cons

0

Minimum Energy Performance and moduline units

CI-v4 EAp2:Minimum energy performance
posted by  Scott Harbaugh  on 

The facility in which we are designing a 20,000+ square foot office space project is served by the old Carrier moduline units.  Is it possible to get EQ prerequisite Minimmum Energy Performanc

1
Tue Nov 28, 2017, 4:55 pm

Requirement of entryway system

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Yan-Chuan Chen  on 

I am currently working on a residential building. For LEED V2009, the requirement of the permanent entryway system should have 3m long in the primary direction of travel.

1
Thu Apr 26, 2018, 10:25 pm