Forum quick links
Water Metering (prereq and credit)
Warehouses-NC-v4 WEc4:Water meteringposted by Ryan McEvoy on
If a project installs one meter for the building (essentially collectively metering indoor plumbing fixtures and domestic hot water) and another meter for irrigation water, what are the ramificatio
Constuction Waste plan for Option 2
CI-v4 MRp2:Construction and demolition waste management planningposted by Deborah Stadler on
If a contractor is opting for Option 2 under the Construction and Demolition Waste Management credit, (less that 2.5 lbs/sf) do they still need to plan for Option 1 indicating the 5 streams to obta
MR4, MR5 Credit Default Percentage For Unavailable Information
NC-2009 MRc4:Recycled contentposted by Jack McCaskill on
The steel supplier for the structures contractor on our project has gone out of business and thus information regarding MR4 Recycled Content, and MR5 regional materials information is unavaila
Is metal furniture - tables and/or chairs required to meet the ANSI/BIFMA testing requirements
Retail-CI-v4 EQc2:Low-emitting materialsposted by Cindy Davis on
My retail project has metal furniture that is powder coated. it is my understanding that this would qualify as "inherently non-emitting sources" per LEEDv4 and would not be subject to the BIF
CS 2009 & CI v4
CS-2009 SSc9:Tenant design and construction guidelinesposted by Susan Di Giulio on
Like Melissa Merryweather, I am writing SSc9 Tenant Guidelines for a LEED v2009 C&S project, and now we are well past the line where any tnenat would have to pursue LEED-CI v4.
EBOM Integrated Pest management - indoor and outdoor
Schools-2009 IDc1:Innovation in designposted by Drashti Dhirwani on
For a school project, is it possible to achieve two points in ID for Integrated Pest Management from EBOM credit library?
LEED v.2009 NC EA Credit 5
NC-2009 EAc5:Measurement and verificationposted by Andrew Buck on
We are designing a Hotel with the following systems:
LEED CI project boundary
CI-2009 PIf1:Minimum Program Requirementsposted by Drashti Dhirwani on
I am working on a 125,000 SF CI project, where approximately 2,500 SF space (2 private offices and a kitchen) was designed by a different designer, has a different contractor and is being cons
Minimum Energy Performance and moduline units
CI-v4 EAp2:Minimum energy performanceposted by Scott Harbaugh on
The facility in which we are designing a 20,000+ square foot office space project is served by the old Carrier moduline units. Is it possible to get EQ prerequisite Minimmum Energy Performanc
Requirement of entryway system
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Yan-Chuan Chen on
I am currently working on a residential building. For LEED V2009, the requirement of the permanent entryway system should have 3m long in the primary direction of travel.