Fan Power Approach Not Commented on by LEED Reviewer
NC-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I just got some comments back from a LEED submission. The reviewer notes that my input summary does not match the plans.
EA Pr2 Form V5 - EAp2-9
Schools-2009 EAp2:Minimum Energy Performanceposted by Robert Barrett on
My project does not comply with section 1.9A (minimum compliance requirements for process energy modeling) so I need to upload a narrative.
Glass skylights and existing roof
NC-v4 SSc5:Heat island reductionposted by Jonathan Hickerson on
I have an existing metal standing seam roof that is historic and will remain, and there is a new skylight going in.
Apartment flush-out
NC-v4 EQc4:Indoor air quality assessmentposted by Mike Henderson on
I'm not an engineer or designer, but I have a question related to a new apartment I just moved in to. The building is new construction, and only the 4th floor (top floor) is completed.
Calculating Ds for cooling condition
NC-2009 IEQp1:Minimum IAQ Performanceposted by William Beechinor on
Hello, I am trying to determine whether or not I am calculating Ds correctly.
2 Types of Tviz in each window
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ileana Schinder on
The windows in my project have 2 types of t-viz in each window (above 8'0 is non visible light). How do you document 2 types of tviz in a single room? the excel file doesn't accomodate for that.
Interior Cross-Contamination Prevention, Industrial Curtain Wall
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Ashley Wisse on
Our project contains a theater scene shop including a small area where spray paint will occasionally be used.
EAp2
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Peter Doo on
If I have an Interior Lighting COMcheck completed for a project, is that sufficient enough for upload or do I still have to provide the Lighting Compliance Documentation Interactive Compliance Form
Option 1 Workforce Development Training
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Summer Minchew on
I have a project that has entered in to a Project Labor Agreement including the following: 1) Small, Local Disadvantaged Business Development Assistance, 2) First Source Employment Agreement (defin
Roof cleaning and water
EBOM-2009 SSc7.2:Heat Island Reduction—Roofposted by Kimberly Hosken on
If LEED reviewers are now rejecting hardscape management plans for using power washing (water), does anyone know if using "water" to clean our roof will be rejected?