NC-v4 EAp2:Minimum energy performanceposted by Charles Daze on
I have a HVAC system with labs on it requiring 100% outside air systems. Following all the guidance in 90.1 these spaces require a dedicated Sys 5/7 because they are over 5,000 cfm.
IAQ Procedure is NOT acceptable?
CI-2009 IEQp1:Minimum IAQ Performanceposted by James Keohane on
I recently received a Design Review comment advising that the IAQ procedure included in Chapter 6 of the ASHRAE 62.1-2007 is not an acceptable tool to demonstrate compliance.
Existing Building, Renovations Taking Place Piecemeal
CI-v4 EQc4:Indoor air quality assessmentposted by Sara Zoumbaris on
We have a university lab project that is renovating a select number of rooms, with varying materials/ systems being replaced at different times.
Garage Space - Negatively Pressurized Rooms
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Panda Aumpansub on
Hello there, For garage spaces that are designed for CO/NO₂ monitoring and have a neutral (Exhaust air – Supply air = 0) pressurization.
Athletic Track
NC-2009 SSc2:Development Density and Community Connectivityposted by Erica Downs on
Has anyone successfully used an Athletic Track as a "fitness center" option? Definitely open the public and seems like it should fly. Thanks!
PIf2- Project Summary Details
NC-2009 PIf2:Project Summary Detailsposted by Karly Michalowski on
What to do if project owner will not supply project budget?
Rennovation with small addition
NC-2009 EAp2:Minimum Energy Performanceposted by Stephanei Mezynski on
I am working on a project that is 15,00 sqft renovation and 8,000 sqft new construction (addition).
Enhanced Cx - EAc3;
NC-2009 EAc3:Enhanced Commissioningposted by Miles Britz on
Systems Manual; on our Const. Phase submittal the reviewer stated we need to include a Systems Manual. It appears this refers to the Training of staff on the bldg.'s.
Sub-merters
EBOM-v4 EAp2:Minimum energy performanceposted by Ann-Judith Belanger on
Hi, we have a building that share some mechanical equipment with the adjacent building.
Calculations for an Elementary School
Schools-NC-v4 LTc7:Reduced parking footprintposted by Cynthia Kaplan on
We are trying to figure out how to translate our ITE calcs properly for an elementary school project.