ID Credit for CSv 2009 Project

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  José Solis  on 

Is it possible to use this credit as an ID credit for a CS v2009 project? Could we achieve it if we write the requirements into the tenant lease language or the binding tenant requirements?

1
Tue Mar 22, 2016, 10:21 pm
1
Tue Feb 10, 2015, 2:42 pm

Credit Still Open?

Pilot-Credits PC12:Reduced Automobile Dependence
posted by  Rachel Bannon-Godfrey  on 

Hello! We are interested to pursue option 1 and are using LEEDv4. Is this credit still open for registration? Thanks!

0

Can We Use Both Facility and Site Rates?

NC-2009 MRc2:Construction Waste Management
posted by  Sara Zoumbaris  on 

Hi all, I am working on a project that ended up using 2 separate waste haulers during the time of the project - one for the first half or so, and the second for the remainder of the project.

1
Wed Apr 15, 2015, 2:55 pm

Green-E Equivalency

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  David Ellner  on 

We have pursued EAc4, using a combination of on site and off site renewable energy sources. On site sources is not a problem.

1
Wed Mar 8, 2017, 11:49 pm

Construction - Indoor Air Quality V2009

Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Noelle Hunner  on 

Does the indoor air quality credit allow for propane powered lifts (inside the building) during construction? Or do they have to be battery powered only?

1
Wed Jul 22, 2015, 4:38 am

Is touch-up paint exempt?

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Erin Holdenried  on 

This LEED Interpretation states that touch-up paint consists of small unanticipated quantities that can't be controlled by specifications, and therefore is exempt from the credit.

1
Thu Sep 24, 2015, 4:27 am

Views exculsion for High Bay Window areas

Schools-2009 IEQc8.2:Daylight and Views—Views
posted by  David Sundersingh  on 

We are in the early stages of design for a Career Compact Center, this has 3 workshop areas with high bay windows for natural lighting.

1
Tue Apr 4, 2017, 5:37 pm

Project has all 5 Categories

Schools-2009 WEc4:Process water use reduction
posted by  Sara Zoumbaris  on 

Hi all, My project has all 5 categories installed (dishwasher with racks, pre rinse etc..), however one of the products is above the maximum limit.

1
Wed Nov 25, 2015, 2:38 am

Annual Energy Cost

NC-2009 EAc2:On-Site Renewable Energy
posted by  Sarah Thompson  on 

I am trying to figure out which cost to put in here. Another post said it was savings, although I can't find anything under the credit intent or resources for this specific item.

1
Wed Feb 18, 2015, 10:30 pm