Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Incomplete Space within LEED-CI Multi-Use Building

CI-2009 PIf1:Minimum Program Requirements
posted by  Sara Zoumbaris  on 

Hello, We are working on a multi-use building that will house a hotel, residence, retail and a restaurant.

0

CI 2009 SS C2

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Neil Rosen  on 

Can a golf course be used as a park in SS C2 Community Connectivity?

1
Wed Dec 30, 2015, 5:37 pm

Accounting for shower use by non-occupants

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Deborah Lucking  on 

Ours is a campus project where FTEs from a number of buildings have access to showers and lockers in a separate "clubhouse" building.

1
Mon Jan 4, 2016, 4:54 pm

Major Renovation prerequisites

LEED Rating System Selection
posted by  Vanessa Poirier  on 

Hi all, In the case of a Major Renovation project, are all prerequisites must be answered (in all categories) or only the ones for the categories affected by the project.

1
Tue Jan 31, 2017, 4:40 pm

How do I know if my project is in a LEED ND community

LEED Rating System Selection
posted by  Erika Duran  on 

Is there are a resource out there that lets you know if your building is located in a LEED ND property? I tried GBIG but doesn't seem to have ND projects in their database.

1
Fri Nov 27, 2015, 9:57 pm

MRc4 Recycled Content Calculation

NC-2009 MRc4:Recycled Content
posted by  Jack Jennings  on 

Can Division 2 materials (hardscape, storm/sanitary utilities, landscaping) be excluded from the overall material cost when calculating for this credit?

1
Fri Apr 7, 2017, 1:08 am

long term lease as NC innovation credit

CI-2009 MRc1.1:Tenant Space—Long-Term Commitment
posted by  Maggie Pipek  on 

Has anyone ever successfully modeled an ID credit for the NC rating system after the CI MRc1.1 Long Term Lease credit?

1
Tue Dec 29, 2015, 6:55 pm

Building Flush - Filter Change?

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Brianne Smith  on 

Our project is pursuing Option 1 Path 2 - Flush During Early Occupancy. Do filters need to be replaced after the flush, or only after construction as part of IEQc3.1?

1
Tue Apr 5, 2016, 5:12 pm

Residents excluded?

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Miranda Lescaze  on 

A portion of our building is office space and a portion is multi-family senior residences.

1
Thu Mar 10, 2016, 12:46 am

What are the baseline conditions?

EBOM-v4 SSc5:Site management
posted by  Zachary Hayes  on 

This says we have to reduce from the baseline, which I assume is our initial reported use. However, if this is the case how can there be any reduction?

0