Is there a occupancy % under 100% that is still considered 100%?
EBOM-2009 PIf3:Occupant and Usage Dataposted by Vanessa Seibert on
In our attempt to fill out PI form 3 we are recognizing that completing the form to note every time within 5 years that the 800,000 s.f.
Implementing on a university campus
Pilot-Credits PC14:Walkable Streetsposted by Dee Spiro on
When I searched the forum for insight on how to apply/adapt some of the requirements for a campus setting, the posts were from way back in August 2012.
How to specify for v4 LEED compliance
Data-Centers-NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Lissa Spitz on
Any recommendations on specs for the v4 MR credits? For example, we used to say 10% recycled materials required.
Innovation in Design credit - Low Mercury Lighting
NC-2009 IDc1:Innovation in Designposted by Jordan Kirrane on
Hi all, I have a data centre in Montreal that is being assessed against BD+C NC v 2009.
Mechanic Area Washfountatin
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Robin Dukelow on
We have a NC-2009 project were there is an automotive service area that has a washfountain for use by the mechanics only.
PV - how is it accounted for?
Mid-Rise-v4 EAp1:Minimum energy performanceposted by sue bryant on
I would like to confirm that PV is accounted for solely in the energy model for V4 Midrise projects. Unlike Homes, there are no credits targeting PV. Also, I see no Innovation credits.
IECc6.1 Hotel Servery
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Glenn Haydu, AIA, LEED AP on
Our LEED review for the breakfast servery offered in the hotel is that we do not comply with multi-occupant spaces for lighting controls. We offered occupancy sensor with "forced off" override.
Group Certification NC V3 EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Neil Rosen on
I am working on a project that consists of 2 buildings on one site that I plan on certifying using the Group Certification option discussed in the LEED Campus Guidance document.
clay roof tiles - if acceptable under MRc6?
NC-2009 MRc6:Rapidly Renewable Materialsposted by Debra a. Lombard on
Are clay roof tiles (made in US) acceptable under MRc6? What about lime based plaster (made in US)? Thanks!
Water-Related Systems Implementation Phase
CS-v4 IPc1:Integrative processposted by Tyler Young on
I love the introduction of this credit. I have a question regarding the implementation phase of the water-related systems.