MRp2-2 : High Pressure Sodium Lamps
Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Ashley Johnson on
There are no HPS lamps installed on our project so how do I close this part of the form so that I can check for compliance and submit? I just put "0" quantity but will that suffice?
Pilot Credit Closed
Pilot-Credits EQpc22:Interior lighting - qualityposted by Laurel Swan on
This Pilot Credit is now listed as closed to new registrations and I do not see it in the Innovation Catalog. Does that mean that this is no longer an option for an Innovation in Design credit?
Non regulated items (residential light & receptacle loads)
NC-2009 EAp2:Minimum Energy Performanceposted by Abena Darden on
We are looking at an energy model report for a Residential tower. The project was initially achieving 12% savings.
ESv3 checklists
Mid-Rise-v4 EAp1:Minimum energy performanceposted by Sue Bryant on
The EAp1 v4 requirement is to meet ESv3 by completing the thermal enclosure system rater checklist, the HVAC system quality install rater and contractor checklist and the water management system bu
Custom furniture for LEED project
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Roxanne Button on
I haven't found any other discussions about this - apologies if I missed it somewhere: my client is a custom furniture manufacturer and they are bidding on a LEED CI project.
DDA Boundary
NC-v4 LTc3:High priority siteposted by Trevor Anderson on
Does a project still qualify for credit if the site is within a DDA boundary that is set to change in the upcoming months?
Farmland of Statewide Importance
NC-2009 SSc1:Site Selectionposted by Norma Lehman on
Our project is LEED NCv2009 and the site is designated as "Farmland of Statewide Importance", but not Prime Farmland. We are trying to clarify Prime Farmland v. Farmland of Statewide Importance.
Fleet Vehicle Parking CI 2009 SSc3.3
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Jessica Kavanagh on
Working toward certification under CI 2009 version. Renovation to an existing building that is less than 75% of total building space, so we are under Case 1 Option 1.
Fan Power Approach Not Commented on by LEED Reviewer
NC-2009 EAc1:Optimize Energy Performanceposted by Charles Shinneman on
I just got some comments back from a LEED submission. The reviewer notes that my input summary does not match the plans.
EA Pr2 Form V5 - EAp2-9
Schools-2009 EAp2:Minimum Energy Performanceposted by Robert Barrett on
My project does not comply with section 1.9A (minimum compliance requirements for process energy modeling) so I need to upload a narrative.