Forum quick links
LEED user Assembly Calculator for Certified Wood
NC-2009 MRc7:Certified Woodposted by Esther Kohout on
Still confused on FSC certified wood. If we as FSC Certified woodworkers, create an assembly with FSC materials, and non FSC materials, that assembly cannot be claimed as an FSC certified.
Places of Respite as a Schools ID credit?
Schools-2009 IDc1:Innovation in Designposted by on
Has anyone used/documented the LEED for Healthcare SSc9 "Places of Respite" credit as an ID credit in the LEED for Schools rating system?
Site Management-Organic Waste Management
EBOM-v4 SSp1:Site management policyposted by Ileana Delgado on
Manufacturing projects need to consider organic waste management?
new building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Bo Slendak on
We are currently doing a government facility and the project requires a LEED notebook be kept. Not having done this prior I need some guidance as to what and how to complete.
Testing with multiple systems in one space
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nate Steeber on
I've looked deeply into all the comments here, but I can't seem to find an answer - I apologize if this is a repeat, or too simple of a question: My project has many AHUs, in some cases two differ
Indoor Water Use Reduction Credit Threshold - 7 pt?
CI-v4 RPc1:Regional priorityposted by Aaron Dahlstrom on
I am considering pursuing the RP point available in Philadelphia, PA for Indoor Water Use Reduction.
Update on USGBC approved multi-attribute certifications?
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Landry Watson on
Question: Have we any new updates or additional guidance on what certification that Div 9 (finishes) materials should achieve?
PC 112 Calculating costs
posted by Maki San Miguel Paulson on
The requirement is to use 25% by cost, of the total value of permanently installed products in the project.
Enhanced Refrigerant Management - Purchased Cooling Loop
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Vinny Greco on
If a university building is tied in to a campus chilled water distribution, does the campus chiller plant have to be included in the building's refrigerant use?
Option 3 - strategy 2
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Gail Napell on
The credit language reads: Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable.