Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

ASHRAE HVAC Apps Handbook Equation, Table 2, and Walls

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Avery Colter  on 

OK, so a reviewer directed me to the 2011 ASHRAE HVAC Applications Handbook.

0

Major renovation of historic district bldg in historic district

LEED Rating System Selection
posted by  Pamela Smith   on 

Renovating of 1980s renovation of a 3 story office building in a historic district. Basically zero lot line, it has small pooled parking with neighboring buildings.

1
Sat Aug 26, 2017, 7:57 pm

LEED CI Regional Priority Documentation

CI-2009 RPc1:Regional Priority
posted by  Bethany Beers  on 

It's not clear to me where to document the points for RPC's. At the end of each template, there is a check box for ID points, but nothing for RPC points.

1
Tue Mar 15, 2016, 7:53 pm

Can I defer any ID credit to submit it w/ construction package ?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

1
Mon Jun 1, 2015, 9:00 pm

SSc4.1 Bus Rapid Station

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Christopher Widdowson  on 

Are there any post criteria or definitions of what constitutes a Bus Rapid Station or Terminal?

1
Thu Sep 8, 2016, 11:42 pm

Modeling HVAC for future un-designed office space

NC-2009 EAp2:Minimum Energy Performance
posted by  Vernon Smith  on 

I am modeling a 50,000 sf college cafeteria that has a basement, a main floor and a mezzanine. A portion of the basement is part of the cafeteria.

1
Fri Dec 9, 2016, 3:38 pm

Final Report

NC-v4 EAc1:Enhanced commissioning
posted by  Colin Grist  on 

Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin

1
Tue Dec 13, 2016, 6:32 pm

93727 On-site & Off-site Ren. En. - RP for 6 Points if only Off?

EBOM-2009 RPc1:Regional Priority
posted by  Michelle Bracewell-Musson  on 

Hello, I know that a project can only earn Exemplary if 100% is off-set, however, it must be a COMBINATION of On-site and Off-site to earn EP.

1
Thu Mar 10, 2016, 4:03 am

TPO Roofing

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Celimar Fournier  on 

Are roofing materials part of this credit? Do I need to take into consideration the VOC Content of the TPO Bonding Ahesive, TPO Cut Edge Sealant, TPO Primer and the TPO Seam Cleaner?

1
Fri Mar 3, 2017, 6:06 pm

Use of Microfiber

EBOM-v4 EQp3:Green cleaning policy
posted by  Louise Taillon  on 

I am confused on the use of microfiber in a green cleaning policy and program. Is the use of microfibers required as part of a high Performance cleaning program?

1
Mon Oct 20, 2014, 2:43 pm