Forum quick links
Core Performance Guide
NC-2009 EAp2:Minimum Energy Performanceposted by Tricia Loe on
I have a project that is considering using the Core Performance Guide option for compliance with this credit.
No irrigation for pre-req
NC-v4 WEp1:Outdoor water use reductionposted by Robyn Dowsey on
I have two turf areas that will not be irrigated after establishment My understanding is that for the water sense calculator you must model them with irrigation is they are landscaped Is this true
HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Vicki Rybl on
The base building for my project is an odd shape and there are a few zones which touch two building walls (for example, a conference room has one window which faces west and three windows which fac
ASHRAE Advanced Energy Design Guide - Option 2
NC-v4 EAc2:Optimize energy performanceposted by Aaron Wascher on
Does anyone know if this applies to new construction only or do renovated spaces need to be upgraded to meet this? My project is 17% new/83% renovation.
Shared HVAC system with non-LEED building
NC-v4 EAc2:Optimize energy performanceposted by GBD Architects on
Hi all, We are looking to certify a new building on a higher-ed campus that will be sharing HVAC systems with an existing building. The existing building will likely not pursue certifications.
LEED Site Boundary - Campus - easement for utilities
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michele Helou on
'The LEED project boundary must include .......all land that was or will be disturbed for the purpose of undertaking the LEED project.' What if a small section an adjacent campus parking lot that
washer/dryer - what is actual issue, the exhaust or chemicals?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Renee Shirey on
We have a project that has a washer & dryer in the corner of a building services room, for periodic/sporadic use.
Battery Disposal
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Claire Bannister on
Sorry if this is a repetitive question, but just need clarification- we are meant to be weighing batteries such as AAAs and AAs prior to disposal? and same with light bulbs?
Master's Research Survey
NC-2009 MRc4:Recycled Contentposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
Project using EApc67 for Minimum and Optimize Energy Performance
Pilot-Credits EApc67:Energy Jumpstartposted by Greg Romanczyk on
We've registered for EApc67 for our LEED O+Mv4 project.